July 09, 2026 05:44 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Indian techie allegedly kills wife in US, sends photo of her body to 'secret girlfriend' in India; arrested | 'I fled the city': Thane doctor quits after alleged assault by Shiv Sena leader | Sensex surges 500 points before losing steam, ends marginally higher after volatile trading session | US court drops charges against Indian-origin doctor who drove Tesla off 250-foot cliff with family | Dalal Street bleeds! Sensex tanks over 1,600 points after Trump declares Iran ceasefire 'over' | 'It's over': Trump says on ceasefire with Iran | PM Modi visits 1,000-year-old Prambanan Temple in Indonesia, shares majestic aerial view of the holy site | Baruipur minor rape-murder case: Key accused Pravash Mondal killed in encounter | 'We have been cheated': Egypt coach slams refereeing after Argentina match sparks controversy | From 0-2 to victory! Argentina stage miraculous comeback amid referee drama to crush Egypt's World Cup dream

Alstom T&D India to help harness solar power potential of Rajasthan

| | Dec 17, 2014, at 07:21 am
Kolkata, Dec 16 (IBNS): Alstom T&D India has secured an order worth around 151.5 crore from Rajasthan Rajya Vidyut Prasaran Nigam Limited (RRVPNL) to supply a 400/220 kV substation in Bhadla,and expand the existing 400/220 kV substation in Bikaner, both situated in the state of Rajasthan.

The new 400 kV grid substation in Bhadla will help evacuate power from the Bhadla solar park and other upcoming solar parks in the area, while the expansion of the 400/220 kV substation at Bikaner will facilitate the exchange of solar power generation with the national grid.

Alstom T&D India will design, engineer, manufacture, install and commission the Bhadla 400/220 kV substation, including twenty 400 kV bays and seventeen 220kV bays. The Bikaner expansion project includes the supply of eight 400 kV bays, transformers, circuit breakers, control and protection relays and substation automation system. All equipment will be manufactured and supplied from Alstom T&D India’s manufacturing.

Rathin Basu, Managing Director, Alstom T&D India said, “Clean renewable energy sources are imperative for a sustainable future. Recent years have witnessed a shift in the energy mix of the country and clean power has never been more important."

"Alstom is pleased to offer its leading and advanced solutions to strengthen the Rajasthan transmission network and ensure efficient, reliable and safe evacuation of clean power. We have delivered successful projects for RRVPNL in the past and we aim to continue," he added

He also said, "These projects are part of the state government’s initiative to upgrade and scale the state’s transmission infrastructure for the transmission of clean energy to the national grid. Rajasthan is amongst the few states chosen by the Ministry of New and Renewable Energy (MNRE)as models for the proposed mega solar parks,whose installed solar power capacity will be scaled to 100,000 MW by 2022."

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm