February 20, 2026 07:27 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
PM Modi warns ‘AI must not control humans’ as India unveils bold tech vision at AI Impact Summit 2026 | Former South Korean President Yoon Suk Yeol sentenced to life over failed martial law bid | Tata Group joins hands with OpenAI in massive AI push to transform India and global industries | Epstein Files row: Bill Gates to skip keynote address at AI Summit 2026 | AI Impact Summit: Google launches game-changing America-India Connect plan with $15 billion backing | AI takes centre stage as Modi meets Google CEO Sundar Pichai in Delhi | G7 Spotlight: Emmanuel Macron invites Narendra Modi for 2026 Summit | AI Summit embarrassment! Galgotias University asked to vacate stall after ‘own robot’ exposed as China’s Unitree Go2 | Actor Rajpal Yadav granted interim bail in ₹9-crore cheque bounce case | Learn AI or become redundant: Microsoft India President issues stark message
BHEL
Photo Courtesy: Unsplash

BHEL bags NTPC order to set up thermal power project in Chhattisgarh

| @indiablooms | Aug 31, 2023, at 05:27 am

New Delhi: State-run engineering firm BHEL has secured the order for setting up the 2x800 MW Supercritical Thermal Power Project Stage-II at Lara in Chhattisgarh through International Competitive Bidding, according to a regulatory filing on Wednesday.

Revealing further details on the order win, the state-owned company said, “Scope of work includes Design, Engineering, Manufacture, Supply, Construction, Erection, Testing & Commissioning with Civil & Structural works for the EPC Package with Steam Generator capable of Biomass co-firing, Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, balance of plant packages etc.”

According to the filing, BHEL has to execute Unit-1 within48 months from zero date and Unit-2 within 52 months from zero date.

In a separate exchange filing, NTPC communicated that its board of directors has given its nod to investment approval for setting up of Lara Super Thermal Power Project, Stage-II (2x800 MW) at Rs 15,529.99 crore.

BHEL bagged the new order days after it secured a Rs 2,242-crore order from NHPC and another worth Rs 4,000 crore from Adani Power subsidiary.

Recently, BHEL won orders amounting to Rs 4,000 crore from an Adani-group subsidiary, Mahan Energen, to supply equipment for power generation to be used in its upcoming 2x800 power project at Bandhaura, Madhya Pradesh.  Additionally, it bagged Rs 2241.86 crore worth order from NHPC Limited, Faridabad, on August 25.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm