July 11, 2026 09:07 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Highway blocked, stones pelted, cops injured': BJP faces open revolt in Madhya Pradesh over Narottam Mishra ticket snub | Two Kolkata Police DCPs suspended over alleged remarks against Bengal CM Suvendu Adhikari | Bail to Bloodbath: Telangana man allegedly kills wife, kids and teen who accused him of sexual harassment | Prakash Raj gets bail in multiple voter registration case linked to 2019 polls | ED raids Shekhar Suman associate's premises in FEMA case; phone allegedly thrown from 13th floor | 'Candidate fled': Prashant Kishor jibes BJP over Bankipur nominee change | BJP replaces candidate days before high-stakes Bankipur bypoll | Foreign franchise league enters India! BBL opener to be played in Chennai, announce Modi-Albanese | 'They could have stopped me': Vijay blames police, former DMK government over Karur stampede | 'People will correct their 2025 mistake': Electoral debutant Prashant Kishor predicts BJP defeat in Bankipur
Gurugram Metro
Representational image (Credit: Wikimedia Commons)

Cabinet approves metro connectivity from Gurugram's HUDA City Centre to Cyber City, with spur to Dwarka Expressway

| @indiablooms | Jun 08, 2023, at 05:32 am

New Delhi: The Union Cabinet on Wednesday approved a metro connectivity project from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram covering a distance of 28.50 km having 27 stations on the route.

The total completion cost of the project will be Rs 5,452 crore.

This will be a standard gauge line of 1435 mm (5 ft 8.5 inches).  The entire project will be elevated.

The spur from Basai village has been provided for connectivity to the depot.

The project is proposed to be completed in four years from the date of sanction of the Project and is to be implemented by Haryana Mass Rapid Transport Corporation Limited (HMRTC) which will be set up as a 50:50 Special Purpose Vehicle (SPV) of the Government of India and Government of Haryana after sanction order is issued.

Commerce and Industry Minister Piyush Goyal said in a press conference that the project cost will be shared by the Centre and the state besides an international development assistance loan.

As of now, there is no metro line in Old Gurugram, but there are plans to establish one that would connect New Gurugram with Old Gurugram.

The 27 stations in this line are: HUDA City Centre – Sector 45 – Cyber Park – Sector 47 – Subhash Chowk – Sector 48 – Sector 72A – Hero Honda Chowk – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai Village – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Bajghera Road – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar Phase 5 – Cyber City

The spur to Dwarka Expressway (Sector 101)

This proposed metro network is also expected to have a connection with the Indian Railway station. In its subsequent phase, the metro line aims to provide convenient connectivity to the Indira Gandhi International (IGI) airport.
The introduction of this metro line is anticipated to contribute to the overall economic development of the area.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm