July 10, 2026 03:38 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Indian techie allegedly kills wife in US, sends photo of her body to 'secret girlfriend' in India; arrested | 'I fled the city': Thane doctor quits after alleged assault by Shiv Sena leader | Sensex surges 500 points before losing steam, ends marginally higher after volatile trading session | US court drops charges against Indian-origin doctor who drove Tesla off 250-foot cliff with family | Dalal Street bleeds! Sensex tanks over 1,600 points after Trump declares Iran ceasefire 'over' | 'It's over': Trump says on ceasefire with Iran | PM Modi visits 1,000-year-old Prambanan Temple in Indonesia, shares majestic aerial view of the holy site | Baruipur minor rape-murder case: Key accused Pravash Mondal killed in encounter | 'We have been cheated': Egypt coach slams refereeing after Argentina match sparks controversy | From 0-2 to victory! Argentina stage miraculous comeback amid referee drama to crush Egypt's World Cup dream
India's Renewable Energy capacity as of Sept 2024 is 201 GW. (Photo courtesy: Unsplash)

India's RE capacity to hit 250 GW by March 2026

| @indiablooms | Nov 20, 2024, at 01:06 pm

New Delhi: India's renewable energy capacity is projected to reach 250 GW by March 2026, supported by a robust project pipeline exceeding 80 GW, according to a report by ICRA on Tuesday.

This growth is attributed to a notable increase in tendering activity in FY2024, the rating agency stated, PTI reported, citing the ICRA report.

ICRA estimates that India’s installed renewable energy capacity, including large hydro projects, will rise from 201 GW in September 2024 to approximately 250 GW by March 2026.

Girishkumar Kadam, Senior Vice President & Co-Group Head - Corporate Ratings at ICRA, highlighted the significant contribution of rooftop solar and commercial and industrial (C&I) segments to this growth.

However, he noted that challenges such as delays in land acquisition and transmission connectivity could hinder progress if unresolved.

ICRA also projected an energy storage capacity requirement of 50 GW by 2030, which will be fulfilled through battery energy storage systems (BESS) and pumped storage hydro projects (PSP).

India aims to achieve an ambitious 500 GW renewable energy capacity by 2030.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm