December 28, 2025 01:02 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
CBI moves Supreme Court challenging Kuldeep Sengar's relief in Unnao rape case | Music under attack: Islamist mob attacks James concert with bricks, stones in Bangladesh, dozens hurt | Christmas vandalism sparks mass arrests in Raipur; Assam acts too with crackdown on 'religious intolerance' | BJP's VV Rajesh becomes Thiruvananthapuram Mayor after party topples Left's 45-year-rule in city corporation | ‘I can’t bear the pain’: Indian-origin father of three dies after 8-hour hospital wait in Canada hospital | Janhvi Kapoor, Kajal Aggarwal, Jaya Prada slam brutal lynching in Bangladesh, call out ‘selective outrage’ | Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion
Talcher Coalfields
Image Credit: PIB

Mahanadi Coal Railway Ltd (MCRL) to efficiently evacuate coal in Talcher Coalfields

| @indiablooms | Jul 12, 2022, at 06:01 am

New Delhi: In order to ensure efficient coal evacuation, construction of rail line has been started in a phased manner in Talcher Coalfields namely MCRL (Mahanadi Coal Railway Limited). 

The Ministry of Coal has identified construction of MCRL Phase I & II project as high Impact project under PM Gatishakti. “Mahanadi Coal Railway Limited (MCRL)” was incorporated on 31.08.2015 with 64% share of Mahanadi Coalfield Limited (MCL), 26% of IRCON and 10% share of Industrial Development Corporation of Odisha (IDCO)

The Alignment of the project traverses through Angul district in Odisha. Angul and Jarapda are existing stations of Indian Railways network. Balram is existing loading station in Talcher –Balram private siding of MCL.

MCRL Phase-I (Angul-Balram) of 14 Km length is expected to be operationalized by this year. This railway line will cater to evacuation of 25 MT coal from MCL mines in Talcher Coalfields.

MCRL Phase-II (Balram-Jarpada-Tentuloi) of 54 Km is expected to be commissioned by Dec’2025. It provides connectivity to allocated coal blocks on the southern side and central part of Talcher Coalfields.

Phase-II is progressing rapidly, notification for Land acquisition and Forestry Clearances have been obtained. This railway line will cater to evacuation of coal from CIL & Non-CIL Coal Blocks in Talcher Coalfields approximately 58 MT.

Thus MCRL rail corridor will be a game changer in the evacuation of coal from Talcher coalfields. The rail corridor will improve faster movement of coal rakes to Paradip and Damra ports thereby decongesting rail network and this will also reduce transportation cost considerably.

Shipping routes are much cheaper compared to rail network and improves coal availability in southern and western region of the country. 

Talcher Coalfields of Mahanadi Coalfield is one of the largest with about 52 BT of coal resources, which is 15% of total prognosticated coal resources in the country. Of the available resources in Talcher Coalfield, more than 63 % (33 BT) lies within 300 m depth, presenting significant potential for open cast mining.

Talcher coalfields has produced more than 95 Million Tonne (MT) coal  during  FY22 and likely to produce about 200 MT in FY 2024-25 and about 300 by FY 2030 from Mahanadi Coalfields Limited and allocated coal blocks. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm