February 20, 2026 02:43 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
PM Modi warns ‘AI must not control humans’ as India unveils bold tech vision at AI Impact Summit 2026 | Former South Korean President Yoon Suk Yeol sentenced to life over failed martial law bid | Tata Group joins hands with OpenAI in massive AI push to transform India and global industries | Epstein Files row: Bill Gates to skip keynote address at AI Summit 2026 | AI Impact Summit: Google launches game-changing America-India Connect plan with $15 billion backing | AI takes centre stage as Modi meets Google CEO Sundar Pichai in Delhi | G7 Spotlight: Emmanuel Macron invites Narendra Modi for 2026 Summit | AI Summit embarrassment! Galgotias University asked to vacate stall after ‘own robot’ exposed as China’s Unitree Go2 | Actor Rajpal Yadav granted interim bail in ₹9-crore cheque bounce case | Learn AI or become redundant: Microsoft India President issues stark message

No shortage of Power for West Bengal: NTPC

| | Apr 04, 2016, at 07:30 pm
New Delhi. Apr 4 (IBNS) There is a dip in the water level at Farakka Feeder Canal due to diversion of water to Bangladesh as per the international treaty and as a result, NTPC said it has been forced to temporarily stop five units (1600 MW) out of its six units (2100 MW) at Farakka.

Currently, one unit of 500 MW is under operation. 

The situation is likely to continue till Apr 10

"However there will not be any shortage of power to the West Bengal as a result of these closures," NTPC said in a statement.

"The total allocation to West Bengal from NTPC stations is 786 MW, which can be fully met by NTPC from its stations, if power is requisitioned by the State. In fact, even now Farakka and Kahalgaon Stations are not fully scheduled, leading to partial loading. If required by the State, NTPC can also supply more than its allocation to West Bengal by supplying surplus power from NTPC stations. The State has also surrendered its 199 MW power allocation from NTPC Barh Stage-II (2X660 MW) in the State of Bihar," it said.

In short, enough power is available with NTPC to meet any requirement of the state, NTPC said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm