July 11, 2026 09:25 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Foreign franchise league enters India! BBL opener to be played in Chennai, announce Modi-Albanese | 'They could have stopped me': Vijay blames police, former DMK government over Karur stampede | 'People will correct their 2025 mistake': Electoral debutant Prashant Kishor predicts BJP defeat in Bankipur | New assassination plot against Trump? Israel's secret intelligence raises alarm amid escalating Middle East tension | Ayatollah Ali Khamenei buried at Iran's holiest shrine as Middle East crisis deepens | Indian techie allegedly kills wife in US, sends photo of her body to 'secret girlfriend' in India; arrested | 'I fled the city': Thane doctor quits after alleged assault by Shiv Sena leader | Sensex surges 500 points before losing steam, ends marginally higher after volatile trading session | US court drops charges against Indian-origin doctor who drove Tesla off 250-foot cliff with family | Dalal Street bleeds! Sensex tanks over 1,600 points after Trump declares Iran ceasefire 'over'
Photo Courtesy: PIB

NTPC's first 800 MW Super Thermal Power Project set up in Telangana

| @indiablooms | Oct 05, 2023, at 02:34 am

Hyderabad: The first 800 MW Unit of phase 1 of the Telangana Super Thermal Power Project of NTPC has been installed in the Peddapalli district.

The project inaugurated by Prime Minister Narendra Modi will provide low-cost power to Telangana.

“Smooth supply of electricity gives momentum to the growth of industries in a state,” the Prime Minister remarked.

He emphasised that the second unit of the project will also be operational very soon, and upon its completion, the installed capacity of the power plant would rise to 4,000 MW.

The Telangana Super Thermal Power Plant is the most modern power plant out of all NTPC power plants in the country.

Phase I of Telangana Super Thermal Power Project of NTPC is being established at an approved cost of Rs 10,998 crore on the available land in the premises of NTPC’s existing Ramagundam station in Peddapalli district.

It will supply 85% of its power to the state of Telangana.

Being a pit-head power station with ultra supercritical technology, this project will also help the state of Telangana with low-cost power.

Further, this being the most efficient power station of NTPC in India, this will reduce specific coal consumption (Total consumption of coal per unit of power generated) and CO2 emissions, making it one of the most environmentally compliant power stations in India.

With commissioning of the 1st unit of the project, the power supply scenario has improved in the state of Telangana as well as in the country. This project will help in strengthening the overall economic growth in the region.

NTPC Ltd. is India's largest integrated power utility, contributing 1/4th of the power requirement of the country.

With an installed capacity of more than 73 GW and a diverse portfolio of thermal, hydro, solar, and wind power plants, NTPC is dedicated to delivering reliable, affordable, and sustainable electricity to the nation.

The company is committed to adopting best practices, fostering innovation, and embracing clean energy technologies for a greener future.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm