December 27, 2025 08:52 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Christmas vandalism sparks mass arrests in Raipur; Assam acts too with crackdown on 'religious intolerance' | BJP's VV Rajesh becomes Thiruvananthapuram Mayor after party topples Left's 45-year-rule in city corporation | ‘I can’t bear the pain’: Indian-origin father of three dies after 8-hour hospital wait in Canada hospital | Janhvi Kapoor, Kajal Aggarwal, Jaya Prada slam brutal lynching in Bangladesh, call out ‘selective outrage’ | Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion | Delhi erupts over lynching of Hindu man in Bangladesh; protest outside High Commission | Targeted killing sparks global outrage: American lawmakers condemn mob lynching of Hindu man in Bangladesh

Reliance signs MoU to develop power project in Bangladesh

| | Jun 06, 2015, at 07:49 pm
Dhaka, June 06 (IBNS): Reliance Power and Bangladesh Power Development Board (BPDB) Saturday signed a Memorandum of Understanding (MoU) to develop 3,000 MW of Liquefied Natural Gas (LNG) based combined cycle power project in Bangladesh in phases, along with a Floating Storage and Re-gasification Unit (FSRU) based LNG terminal to supply re-gasified LNG to the power project.

The MoU was signed during the visit of  Prime Minister  Narendra Modi to Dhaka, said Reliance in a release.

The land for the power project shall be provided by BPDB at appropriate locations. The FSRU terminal shall be set up at Maheshkhali Island in Cox’s Bazar district of Bangladesh.

The Project can be set up quickly and can power the country’s rising demand for electricity and will provide clean and green power. The project is in line with the Master Plan of 2010 for Bangladesh, under which BPDB envisages to develop a 3,000 MW LNG based power project so as to meet the growing power demand and supplement the domestic gas reserves in the country. The project is the largest foreign investment in Bangladesh with a potential investment of about US$3 bn in phases.

Reliance Power is implementing a 2,400 MW gas based combined cycle power project at Samalkot in Andhra Pradesh. World-class equipment for the project have been procured from internationally reputed equipment suppliers and are ready with the company, said the company.

Reliance Power is proposing to install the equipment procured for Samalkot project, including advanced class 9FA machines supplied by GE, in the proposed project at Bangladesh, under appropriate guarantees from GE and the other equipment suppliers. This will help set up the project on a fast-track basis.

Reliance Power Limited, a part of the Reliance Group, is India’s leading private sector power generation and coal resources company. The company has the largest portfolio of power projects in the private sector, based on coal, gas, hydro and renewable energy, with an operating portfolio of 5,945 megawatts. ‘

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm