July 07, 2026 03:31 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
China tests ballistic missile from nuclear submarine in Pacific: Australia, New Zealand respond | Baruipur horror: Main accused in alleged rape and murder of minor girl arrested; senior cops dissatisfied with handling of the case | Defence stocks jump after Rs 52,000 crore DAC approval sparks buying frenzy | 'Harry Kane is a great player': Donald Trump after England knocked Mexico out of the World Cup | 'Referee gave a lot against us': Harry Kane reacts after England's dramatic win over Mexico | England hold nerve with 10 men to knock out Mexico in five-goal World Cup classic | 'Why can't citizens protest against the government? They are being made slaves by slapping cases': Bombay HC slams Mumbai Police, quashes activist's externment | 'First he cheats on me...': Siya Goyal's old pub video goes viral amid probe into fiancé Ketan Agarwal's alleged murder | Ronaldo's goal, Ramos' last-gasp winner send Portugal past Croatia, set up Spain clash | India-US trade deal almost done! Piyush Goyal hints at breakthrough
Kashmir
UNI

Jammu and Kashmir: ERA repairs Jahangir Chowk Rambagh Road, locals express gratitude 

| @indiablooms | Sep 18, 2020, at 02:57 pm

Srinagar: Scores of commuters, shopkeepers and locals of Jahangir Chowk-Rambagh on Wednesday expressed gratitude to the Economic Reconstruction Agency (ERA) for repairing the road stretch from Jahangir Chowk to Rambagh. 

Rising Kashmir had reported the issue and highlighted the dilapidated condition of Jahangir Chowk-Rambagh Road which was causing inconvenience to the commuters, shopkeepers and locals. 

In response, ERA has come into action on the ground and redressed the issue in time. As per the locals, shopkeepers and commuters ERA has recently repaired JahangirChowk- Rambagh Road. 

The road stretch from Jahangir Chowk to Rambagh was in shambles since 2011 owing toconstruction of Jahangir Chowk Flyover Bridge. 

A driver, Showkat Ahmad said that he is very happy and thankful to the Rising Kashmir team who raised this issue to know the ground reality about the road and talked to theconcerned officials. 

“I also thank the ERA for this positive step in the direction of making Srinagar a smart city,” he said.

 Another shopkeeper Haji Maqbool Baba said that he hopes that the waterlogging issueshall also be resolved with this. 

“Commuters won’t get their clothes dirty by the splashes of water anymore as therepairing of the road has taken place,” he said. 

Another local Aijaz Ahmad said that it is not lip service anymore as the Economic Reconstruction Agency has taken a practical step.

“I hope that Rising Kashmir will keep raising the issues and other departments shall comeforward and work for the benefits of the common masses,’’ he said.

Talking Rising Kashmir, Chief Engineer, Roads and Buildings Showkat Jeelani said that ERA is executing the work presently of rigid pavement in the Jahangir Chowk to Rambaghsection with their workmanship and quality control.

 “ERA will set new standards of road construction in the valley,” Chief Engineer said.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.