June 14, 2026 11:34 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tragedy in the skies: Five IAF personnel killed in AN-32 crash in Assam | 'Ask probe officers whether I hid anything': Abhishek Banerjee hits back after pre-dawn police search | Police storm Abhishek Banerjee's house at 3 am tracking aide, Mamata arrives; seizure list says 'NIL' | Big boost for India's security: DRDO successfully tests advanced missile shield | Indian-origin man jailed for 34 years in UK over horrific kidnap, torture and rape case | Mamata's nightmare deepens! Saayoni Ghosh, Dev, Rachana Banerjee among 19 rebel MPs seeking TMC split | Trump claims US 'ended war with Iran', Tehran yet to confirm a deal | Heartbreak for Indian sports: Manu Bhaker's mentor Jaspal Rana passes away at 49 | Three Indian seafarers, missing after US strike on tanker near Oman, confirmed dead | 'Choose your side': TMC MP Kalyan Banerjee's ultimatum to Mamata in open revolt against Abhishek
The development comes as both countries prepare new loan framework to fund next-gen E10 trains. (Image courtesy: Pixabay)

Japan to gift Shinkansen trains for India’s bullet train trials, ahead of new loan pact

| @indiablooms | Apr 18, 2025, at 10:51 pm

New Delhi/ Tokyo: In a significant boost to India’s first bullet train project, Japan will donate two Shinkansen train sets to assist with testing and inspection of the Mumbai-Ahmedabad High-Speed Rail corridor, Japan Times has reported.

One E5 and one E3 series train will arrive in early 2026, each retrofitted with inspection equipment to assess operational challenges unique to Indian conditions, such as high temperatures and dust.

The data gathered from these test runs will help fine-tune the corridor’s systems and pave the way for the introduction of next-generation E10 trains, which are expected to be produced in India starting in the early 2030s.

Until then, modified semi-high-speed trains made domestically are expected to run on the corridor.

The Mumbai-Ahmedabad route marks a milestone in India’s infrastructure development, supported by Japan’s renowned Shinkansen technology.

The project is being funded predominantly through low-interest yen loans from the Japanese government, which cover about 80% of total costs.

With rising expenses, both governments are working to finalise a fresh loan framework to support the introduction of E10 trains, likely to be discussed during Prime Minister Narendra Modi’s upcoming visit to Japan for a bilateral summit.

The donated Shinkansen trains represent Japan’s engineering excellence.

The E5 is known for its speed and streamlined design, while the E3 series balances efficiency and passenger comfort.

Their deployment in India will generate vital insights into the track conditions and overall performance of the corridor.

Construction of the high-speed rail corridor, led by the National High-Speed Rail Corporation Limited (NHSRCL), has been progressing steadily since November 2021. So far, bridges have been built across six rivers in Gujarat as part of the 24 total river crossings along the route.

Highlighting the project's transformative potential, Union Railway Minister Ashwini Vaishnaw had earlier noted, “The bullet train project has to be seen from the perspective of integrating economies… You can have breakfast in Surat, complete your work in Mumbai, and return with your family by night.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.