July 06, 2026 10:03 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
China tests ballistic missile from nuclear submarine in Pacific: Australia, New Zealand respond | Baruipur horror: Main accused in alleged rape and murder of minor girl arrested; senior cops dissatisfied with handling of the case | Defence stocks jump after Rs 52,000 crore DAC approval sparks buying frenzy | 'Harry Kane is a great player': Donald Trump after England knocked Mexico out of the World Cup | 'Referee gave a lot against us': Harry Kane reacts after England's dramatic win over Mexico | England hold nerve with 10 men to knock out Mexico in five-goal World Cup classic | 'Why can't citizens protest against the government? They are being made slaves by slapping cases': Bombay HC slams Mumbai Police, quashes activist's externment | 'First he cheats on me...': Siya Goyal's old pub video goes viral amid probe into fiancé Ketan Agarwal's alleged murder | Ronaldo's goal, Ramos' last-gasp winner send Portugal past Croatia, set up Spain clash | India-US trade deal almost done! Piyush Goyal hints at breakthrough
Railway
Image Credit: Northeast Frontier Railway

Northeast Frontier Railway gives emphasis on safety measures

| @indiablooms | Nov 14, 2020, at 08:03 pm

Guwahati/IBNS: In view of the importance being given for ensuring safety of train movement, there has been no consequential train accident during the year 2020-21.

It can be mentioned here that last year was also an accident free year for Northeast Frontier Railway.

This has been possible due to overall emphasis given to maintain the health of all train operations related infrastructure in good condition and regular monitoring the same throughout the jurisdiction of NFR.

Track is the most important aspect for safe movement of trains. As a result of train movement, wear and tear of track is bound to occur and renewal/ replacement of track components are indispensable.

During the current year (upto October, 2020) 73.68 CTR units of Track renewal i.e. changing of rails and sleepers have been done against 64.85 CTR units done upto October, 2019. That is an increase of 13.62%.

To detect unseen fractures of railway track which might lead to accident “Ultrasound” testing is done by machine. This is known as USFD testing of track. USFD testing of 1,762.31 Km was done during the month of October 2020 against 1368.54 Km done during October 2019. That is an increase of about 28.77%.

Deep Screening i.e. cleaning of ballast that lies beneath the railway track was done for 46 turnouts during the month of October 2020 against 12 turnouts done during October 2019.

A top official of Northeast Frontier Railway said that 10 numbers of bridges have been rehabilitated during the month of October 2020 making a cumulative progress of 48 numbers during the current year.

Packing of ballast beneath 354 Points and Crossings have been done by UNIMAT machines during the month of October 2020 making a cumulative progress of 3012 points upto the month against proportionate target of 1867 points during this year.

Northeast Frontier Railway has also completed 2,746 numbers of Flash Butt welding of rail joints during the month of October 2020 making a cumulative progress of 13053 numbers of Flash Butt welds upto the month to make the rail joints in track more secure.

The increased emphasis given on safety measures as evident from above has also led to increased speed of trains including goods carrying trains within NFR.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.