January 19, 2025 10:58 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kolkata court convicts civic volunteer Sanjoy Roy in RG Kar rape-murder case | Saif was stabbed repeatedly, he tried to protect Taimur and Jeh: Kareena Kapoor Khan records statement with police | Escaped death by 20-25 minutes: Sheikh Hasina alleges opposition wanted to kill her | Cabinet's decision on 8th Pay Commission will improve quality of life, give boost to consumption: PM Modi | 'It has been an incredibly challenging day': Kareena Kapoor Khan requests privacy after Saif Ali Khan's stabbing incident | 'Distorting history': Mamata slams Mohan Bhagwat over his Ram Temple consecration 'marking true independence' remark | Saif Ali Khan stabbing incident: Actor who received six wounds is out of danger, one accused identified | ISRO creates history docking two Indian satellites in space | US-based short seller Hindenburg Research that targeted Adani Group and SEBI chairperson to be disbanded | Saif Ali Khan stabbed during burglary attempt at home, hospitalised; police probe on
L&T

L&T Construction wins contract from Rail Vikas Nigam Limited

| @indiablooms | Jan 18, 2021, at 03:52 pm

New Delhi: The construction arm of L&T has secured a Large order for its Heavy Civil Infrastructure business from Rail Vikas Nigam Limited (RVNL) for Package 4 of the New Broad-Gauge Line between Rishikesh and Karanprayag in the State of Uttarakhand, India.

The scope of the project includes construction of Tunnels, Formation, Construction Shaft, and other Ancillary works from Chainage 47+360 to 63+117 Km between Rishikesh and Karanprayag.The project involves the construction of 14.577 Km upline and 13.123 Km downline tunnel with embankments of approximately 800 meters at both ends.

Out of 14.577 Km and 13.123 Km of tunnel, 10.49 Km and 10.317 Km of tunnel will be excavated using two new hard rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and the balance using New Austrian Tunnel Method (NATM).

The scope also includes construction of an Ellipsoidal cum Ventilation Shaft in the finished cross-section of 79 square meters and depth of 32 meters.

This will be the biggest TBM to be deployed in the Himalayan region in India and the TBM bored tunnel length of 20.807 Km will be the longest for any project in the Himalayan region. The entire project is to be completed within a stringent timeline of 60 months.

“Establishing a rail link between Rishikesh and Karanprayag will not only facilitate easy access to Uttarakhand’s pilgrimage sites, but also enable development of backward areas, connect new trade centres, and serve the resident population. The railway line traverses rugged Himalayan terrains, with the alignment oriented across and sometimes sub parallel to major thrust zones in the Himalayas with complex geological conditions,”said S.V. Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure).L&T is already constructing Package 2 of this prestigious project involving 24 Kms of Tunnelling by the NATM, minor bridges and formation works.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm
PM Modi on Budget 2024 Jul 23, 2024, at 09:30 pm