January 19, 2025 10:06 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kolkata court convicts civic volunteer Sanjoy Roy in RG Kar rape-murder case | Saif was stabbed repeatedly, he tried to protect Taimur and Jeh: Kareena Kapoor Khan records statement with police | Escaped death by 20-25 minutes: Sheikh Hasina alleges opposition wanted to kill her | Cabinet's decision on 8th Pay Commission will improve quality of life, give boost to consumption: PM Modi | 'It has been an incredibly challenging day': Kareena Kapoor Khan requests privacy after Saif Ali Khan's stabbing incident | 'Distorting history': Mamata slams Mohan Bhagwat over his Ram Temple consecration 'marking true independence' remark | Saif Ali Khan stabbing incident: Actor who received six wounds is out of danger, one accused identified | ISRO creates history docking two Indian satellites in space | US-based short seller Hindenburg Research that targeted Adani Group and SEBI chairperson to be disbanded | Saif Ali Khan stabbed during burglary attempt at home, hospitalised; police probe on

L&T grabs 2x660 MW power project order in Bihar

| @indiablooms | Jun 24, 2019, at 05:26 pm

Mumbai, Jun 24 (UNI) Engineering Major, Larsen & Toubro (L&T) said its power business has bagged a mega engineering, procurement and construction (EPC) order from SJVN Thermal Private Limited to set up a 2x660 MW ultra-supercritical power plant in Buxar district, Bihar.

SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN Limited, a joint venture of the Government of India and the Government of Himachal Pradesh and a Mini Ratna public sector undertaking.

Prime Minister Narendra Modi had laid the foundation stone for the plant in March this year, company said in a filing with BSE.

The scope of work for L&T includes Design, Engineering, Manufacture, Procurement, Supply, Construction, Erection, Testing a Commissioning of Buxar Thermal Power Project (2x660 MW), on turnkey basis,covering steam generator, steam turbine generator, electrostatic precipitator, NOx control system, flue gas desulphurization (FGD) system and complete balance of plant (BoP) systems, including raw

water intake system, make-up water system, coal Et ash handling system, ash dyke, complete Eal system including switchyard and complete civil, structural and architectural works.

Commenting on the order, Shailendra Roy, CEO & Managing Director, L&T Power & WholeTime Director - L&T, said, 'L&T is honoured to take on the responsibility of executing this prestigious project.

Knowing the importance of this project for the state of Bihar, L&T shall aim to set new benchmarks in completion schedule, quality, safety and equipment / system performance. With majority of the equipment including boilers, turbines, generators, etc, being made locally in our world class manufacturing facilities at Hazira, this project will also go a long way in accomplishing the 'Make in India'initiative promoted by the Prime Minister." 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm
PM Modi on Budget 2024 Jul 23, 2024, at 09:30 pm