November 05, 2024 21:55 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Union Minister HD Kumaraswamy booked for threatening cop probing into mining case | Supreme Court upholds validity of Uttar Pradesh Madrasa Education Act | Not all private properties are community resources that govt can take over: Supreme Court | Pakistan's Lahore has become world's most polluted city with an AQI of 1900 on Sunday | Indian Army 'successfully completes' patrolling to a key point in Ladakh's Depsang region
Status of national highway development work on select routes

Status of national highway development work on select routes

| | 10 Jun 2016, 01:46 pm
New Delhi, Jun 10 (IBNS): Union Ministry of Road Transport & Highways published an update on Friday about the status of work going on at the following national highway routes in India -- Kailash-Mansarovar, Chardham , Buddhist Circuit, Ram-Van-Gaman and Ram-Janaki routes.
The Ministry of Defence is funding the construction of the Ghatibagarh-Lipulekh road (G.S. Road with BRO). The length of this road is 75.54 kms and it is part of Mansarovar Yatra route.The connectivity has been achieved up to km 62.00 towards Lipulekh and up to km 29.00 on the Ghatiabagarh side.
 
Under the National Highway Connectivity Improvement Program for Chardham  in Uttarakhand, a project which includes the development of all-weather roads leading to Chardham (Kedarnath, Badrinath, Yamunotri and Gangotri), seven stretches with a length of 889 km are under Design Project Report.  
 
To enhance the safety of road users, provisions like widening of existing narrow and  geometrically deficient National Highways to 2-lane carriageway with paved shoulder, protection of landslide hazard zones, construction of bypasses, long bridges, tunnels and elevated corridors are being planned.
 
Ministry of Road Transport & Highways is developing roads at various places to provide connectivity to Buddhist Circuit. The schemes include Buddhist Circuit (Bihar): Bodhgaya-Nalanda-Rajgir-Vaishali-Kahalgaon-Patna, Dharmayatra Circuit: Bodh Gaya (Bihar)-Sarnath (UP)-Kushinagar (UP)-Piparvah (UP), and Extended Dharayatra Circuit: Bodh Gaya (Bihar)-Vikramshila(Bihar)-Sarnath(UP)-Kushinagar(UP)-Kapilvastu(UP)-Sankisa(UP)-Piparvah(UP).
 
The Ram-Van-Gaman Marg in Uttar Pradesh is claimed to be a road connecting Ayodhya to Chitrakoot via Faizabad, Sultanpur, Pratapgarh, Jethwara, Shrangverpur, Manjhanpur, Rajapur through NHs namely 28, 96 and 731A. The length of this road is about 262 Km.
 
The Ram-Janaki Marg is claimed to be a road connecting Ayodhya to Janakpur in Nepal, passing through places Chhawni, Kalwari, Barhalganj, Barhaj and Uttar Pradesh/Bihar border  in Uttar Pradesh; and from U.P. /Bihar border via Siwan, Chakia, Madhubani, Sitamarhi to Indo Nepal border in Bihar. The road stretches for 218 km in Uttar Pradesh.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.