December 23, 2024 08:18 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter | Who is Sriram Krishnan, an Indian-American picked by Donald Trump as US AI policy advisor? | Mohali building collapse: Death toll rises to 2, many feared trapped for 17 hours | 4-year-old killed after speeding car driven by a teen hits him in Mumbai | PM Modi attends opening ceremony of Arabian Gulf Cup in Kuwait | Jaipur gas tanker crash: Toll touches 14, 30 critical | Arrest warrant against former cricketer Robin Uthappa over 'PF fraud' | PM Modi emplanes for a visit to Kuwait
Video grab

Jain Coral Cove apartment razed down into rubble in Maradu as per SC order

| @indiablooms | Jan 12, 2020, at 05:07 pm

Kochi/UNI: The 55 meter high Jain Coral Cove luxury apartment  built in  violation  of Coastal Regulation Zone (CRZ) norms in Maradu municipality, was razed down within seconds at 11.03 am on Sunday through controlled Implosion.

The apartment which was filled with 400 kg of explosives, was blasted in a controlled manner at the end of the third warning siren.

The interior walls had been removed in a pre-demolition work, leaving it a concrete shell. The luxury apartment became mounds of debris which was witnessed by large number of people.

With this,  three of the four apartment complexes ordered to be demolished by the Supreme Court in September 2018 have been razed down.

The Fire Force personnel sprayed water to control the air pollution from the demolition.

About 400 kg explosives were used for the implosion of Jain Coral Cove, which is largest among the four apartments, consisting of 128 flats.

Meanwhile, Golden Kayaloram,  the last of the four illegal apartments, located at Nettoor in Maradu was demolished through controlled implosion at 1430 hours this afternoon.

With this, the government completed the demolition of all the four illegal  apartments by implementing the Apex Court order.

There was a slight delay in sounding the first siren as the last round inspection was not completed.

The district authorities confirmed that the first siren was delayed which was supposed to blow at 1.30 pm, but it went on at 1.56 pm. The second siren was given at 2.19 pm and third at 2.30 pm.

Jet demolition company, partner firm of Mumbai-based Edifice Engineering carried out the implosion of the Apartment. About 14.8 kg explosives were used to demolish the apartment.

It is the oldest one among the four illegal apartments.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.