December 27, 2024 06:03 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
I have lost a mentor and guide: Rahul Gandhi writes on Manmohan Singh's demise | Manmohan Singh left strong imprint on our economic policy over years: PM Modi | A rare leader who spoke softly but achieved monumental strides: Gautam Adani mourns Manmohan Singh's death | Instagram influencer and freelance RJ Simran Singh dies by suicide in Gurugram | Anna University sexual assault case: Accused is a DMK worker, claims BJP's Annamalai | Celebrities too responsible for crowd control: Telangana CM Revanth Reddy to Telugu filmdom amid Pushpa 2 stampede row | Boat capsizes off Calangute Beach in Goa; 1 killed, 20 rescued | Canada announces change to immigration system, likely to impact Indians seeking permanent residence | Azerbaijan Airlines tragedy: 32 passengers rescued, flight attempted several emergency landing before crashing | Man sets himself on fire near Parliament building; locals, police rush him to hospital
Chenab Bridge
Pixabay (not related to the original story)

Jammu and Kashmir: Locals welcome construction of new bridge over Chenab

| @indiablooms | Jul 10, 2021, at 10:57 pm

Srinagar: The beginning of the construction of  a new concrete bridge over Chenab to replace the old bailey suspension bridge has been appreciated by locals  in Jammu and Kashmir's Ramban, media reports said on Saturday.

For travellers from Gool and Reasi the bridge offers relief. The old bailey suspension bridge, constructed in 1963 by the Central Public Works Department (CPWD), was declared unfit in June 2019, and ever since, it has been repaired several times, reports ANI.

Falling on the old alignment of the Jammu-Srinagar national highway at Maitra in Ramban, the 240ft x 3.75mt bridge connected the major towns of the district, the news agency reported.

Rajinder Singh, a local, told ANI, "The bridge was very old, and we had to take a detour for 13 kilometers if we were travelling via a heavy vehicle, to reach Maitra for work at DC office. Now that the work of a new concrete bridge has begun, vehicles, all big and small, would be able to commute easily. We are happy that the Central government didn't just listen, but also acted on our concerns."

Shabir Ahmed Vaid, the Executive Engineer, Public Works Department (PWD) (Roads and Buildings), said the bridge will be a Canterliver type.

"The under-construction bridge will be 270 meters long and 50 meters high," Vaid told ANI.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.