March 03, 2025 09:29 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Indian woman facing death row in UAE for killing a child has been executed: Foreign ministry tells court | Crucial to have Trump’s support, says Zelenskyy a day after fiery White House exchange | 'We're looking for peace, Zelenskyy wants Russia-Ukraine war to continue': Donald Trump after White House public spat | Volodymyr Zelenskyy refuses to apologise to Donald Trump after public spat over Russia-Ukraine war | 'Make a deal or we are out': Donald Trump tells Volodymyr Zelenskyy at White House | Himachal govt seeks fund from temple to support welfare schemes, BJP calls move 'shocking' | Injustice to opposition MLAs: Atishi writes to Delhi Assembly Speaker on suspension of 21 AAP lawmakers | We will leave for US tomorrow: Father of Indian student Neelam Shinde after urgent visa grant | 'Not joining BJP or floating any party': Abhishek Banerjee dismisses rumours of his split from TMC | Pune bus rape accused arrested after 75-hour manhunt
Railway
Image Credit: Northeast Frontier Railway

Northeast Frontier Railway gives emphasis on safety measures

| @indiablooms | Nov 14, 2020, at 08:03 pm

Guwahati/IBNS: In view of the importance being given for ensuring safety of train movement, there has been no consequential train accident during the year 2020-21.

It can be mentioned here that last year was also an accident free year for Northeast Frontier Railway.

This has been possible due to overall emphasis given to maintain the health of all train operations related infrastructure in good condition and regular monitoring the same throughout the jurisdiction of NFR.

Track is the most important aspect for safe movement of trains. As a result of train movement, wear and tear of track is bound to occur and renewal/ replacement of track components are indispensable.

During the current year (upto October, 2020) 73.68 CTR units of Track renewal i.e. changing of rails and sleepers have been done against 64.85 CTR units done upto October, 2019. That is an increase of 13.62%.

To detect unseen fractures of railway track which might lead to accident “Ultrasound” testing is done by machine. This is known as USFD testing of track. USFD testing of 1,762.31 Km was done during the month of October 2020 against 1368.54 Km done during October 2019. That is an increase of about 28.77%.

Deep Screening i.e. cleaning of ballast that lies beneath the railway track was done for 46 turnouts during the month of October 2020 against 12 turnouts done during October 2019.

A top official of Northeast Frontier Railway said that 10 numbers of bridges have been rehabilitated during the month of October 2020 making a cumulative progress of 48 numbers during the current year.

Packing of ballast beneath 354 Points and Crossings have been done by UNIMAT machines during the month of October 2020 making a cumulative progress of 3012 points upto the month against proportionate target of 1867 points during this year.

Northeast Frontier Railway has also completed 2,746 numbers of Flash Butt welding of rail joints during the month of October 2020 making a cumulative progress of 13053 numbers of Flash Butt welds upto the month to make the rail joints in track more secure.

The increased emphasis given on safety measures as evident from above has also led to increased speed of trains including goods carrying trains within NFR.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.