May 07, 2025 04:59 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Seven Pakistani soldiers killed, five injured in bomb attack on military convoy in southwestern Balochistan | Modi, Albanese eye to advance India-Australia Comprehensive Strategic Partnership during telephone conversation | Hold dialogue with all political parties on caste census: Mallikarjun Kharge writes to PM Modi | PM Modi meets NSA Ajit Doval amid India's wait for retaliation against Pahalgam terror attack | Pakistan grilled at UNSC amid rising tension with India after Pahalgam terror attack | 'We'll do everything we can': US House Speaker backs India in fight against terrorism after Pahalgam attack | Centre asks several states to conduct security mock drills amid tensions with Pakistan, first since 1971 | PM Modi holds meeting with Defence Secy as India plans retaliation against Pahalgam attack | Terror hideout busted in Kashmir's Poonch amid India-Pak border tensions after Pahalgam attack | India snaps water flow to Pakistan from Baglihar dam on Chenab river in Pahalgam fallout
PM Modi
Image Credit : Twitter/ PM Modi

PM Modi inaugurates terminal 2 of Kempegowda International Airport at Bengaluru

| @indiablooms | Nov 12, 2022, at 04:49 am

Bengaluru/IBNS: Prime Minister Narendra Modi inaugurated terminal 2 of Kempegowda International Airport at Bengaluru on Friday.

The Prime Minister also interacted with airport authorities where he was briefed on the model of the terminal 2 building.

PM Modi also inspected the facilities at the experience centre and took a walkthrough of Terminal 2 of the Kempegowda International Airport.

The Prime Minister also witnessed a short film about terminal 2.

In a tweet, he wrote: “Terminal 2 of the Kempegowda International Airport, Bengaluru will add capacity and further convenience. It is a part of our efforts aimed at providing top class infrastructure to our urban centres. The Terminal is beautiful and passenger friendly! Glad to have inaugurated it.”

Terminal 2 of Kempegowda International Airport in Bengaluru is built at a cost of around Rs. 5000 crores.

The terminal will double the passenger handling capacity of the airport to 5-6 crore passengers per annum, from the current capacity of about 2.5 crores.

Terminal 2 is designed as a tribute to the Garden city of Bengaluru and the passenger experience is meant to be a “walk in the garden”.

Passengers will travel through 10,000+ square metres of green walls, hanging gardens and outdoor gardens.

The airport has already established a benchmark in sustainability with 100% usage of renewable energy across the campus.

Terminal 2 has been created with sustainability principles woven into the design. Based on the sustainability initiatives, terminal 2 will be the largest terminal in the world to be pre-certified platinum rating by US GBC (green building council) prior to commencing operations.

The theme of ‘Naurasa’ unites all the commissioned artworks for Terminal 2. The artworks reflect the heritage and culture of Karnataka as well as the broader Indian ethos.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Close menu