April 04, 2026 09:47 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Not denied a ticket’: Annamalai explains absence from BJP’s Tamil Nadu candidate list | ‘Ghar-wapsi soon’: PoK wants to return to India, claims Imam organisation chief | Kerala polls shocker: Tharoor’s convoy stopped, security guard attacked mid-campaign | AAP drops Raghav Chadha from key parliamentary role, sparks buzz over internal rift | Amit Shah to camp in West Bengal for 15 days during Assembly polls; predicts Mamata’s defeat in state and Bhabanipur | 'BJP plotting President’s Rule, don’t fall in the trap': Mamata Banerjee on Malda unrest, urges peace | 'Most polarised state': CJI Kant raps Bengal govt over 9-hour hostage of judicial officers | Bengal SIR protest: Judge pleads for help amid mob attack after 9-hour hostage ordeal | Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow
Gurugram Metro
Representational image (Credit: Wikimedia Commons)

Cabinet approves metro connectivity from Gurugram's HUDA City Centre to Cyber City, with spur to Dwarka Expressway

| @indiablooms | Jun 08, 2023, at 05:32 am

New Delhi: The Union Cabinet on Wednesday approved a metro connectivity project from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram covering a distance of 28.50 km having 27 stations on the route.

The total completion cost of the project will be Rs 5,452 crore.

This will be a standard gauge line of 1435 mm (5 ft 8.5 inches).  The entire project will be elevated.

The spur from Basai village has been provided for connectivity to the depot.

The project is proposed to be completed in four years from the date of sanction of the Project and is to be implemented by Haryana Mass Rapid Transport Corporation Limited (HMRTC) which will be set up as a 50:50 Special Purpose Vehicle (SPV) of the Government of India and Government of Haryana after sanction order is issued.

Commerce and Industry Minister Piyush Goyal said in a press conference that the project cost will be shared by the Centre and the state besides an international development assistance loan.

As of now, there is no metro line in Old Gurugram, but there are plans to establish one that would connect New Gurugram with Old Gurugram.

The 27 stations in this line are: HUDA City Centre – Sector 45 – Cyber Park – Sector 47 – Subhash Chowk – Sector 48 – Sector 72A – Hero Honda Chowk – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai Village – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Bajghera Road – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar Phase 5 – Cyber City

The spur to Dwarka Expressway (Sector 101)

This proposed metro network is also expected to have a connection with the Indian Railway station. In its subsequent phase, the metro line aims to provide convenient connectivity to the Indira Gandhi International (IGI) airport.
The introduction of this metro line is anticipated to contribute to the overall economic development of the area.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm