December 16, 2024 11:48 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bangladesh likely to hold national polls in late 2025 or early 2026, says Yunus in Victory Day speech | Constitution stood test of time: Nirmala Sitharaman in Rajya Sabha | PM Museum requests Rahul Gandhi to return Pandit Nehru's historical letters | Indian tabla maestro Zakir Hussain dies at 73 in San Francisco, confirms family | Kolkata woman strangled, beheaded and chopped into pieces for refusing brother-in-law's advances | Arvind Kejriwal, CM Atishi to contest Delhi polls from current constituencies | Atul Subhash suicide case: Wife Nikita, her mother and brother arrested | Pushpa 2 stampede: Allu Arjun walks out of jail, actor's lawyer slams delay in release | Donald Trump intends to end 'inconvenient' and 'very costly' Daylight Saving Time | Suchir Balaji: Indian-origin former OpenAI researcher found dead at US apartment
Coal India
Image: Pixabay

Coal India Limited's coal output through opencast mines up 18.6 pc

| @indiablooms | Jan 16, 2023, at 11:46 pm

Kolkata: Coal India Limited's (CIL) composite production, the sum total of overburden removal (OBR) and coal output through opencast mines, went up by a sharp 18.6 percent to 1,439.6 million cubic metres (McuM) ending December FY’23, compared to the year-ago same period, CIL sources said on Monday.

This was 101 percent of the target achievement on progressive basis, they added.

The state-owned coal mining Maharatna excavated 1,154.2 McuM OBR till December of the current fiscal year, posting a 19.2 pc growth over a similar period last year and achieving 101 pc of the target.

CIL has also taken up manufacturing sand out of OB creating wealth from waste in an eco-friendly way. Presently, sand demand is met through sand mining and dredging from water courses of rivers which severely affects the ecosystem of rivers.

As an effort towards preserving the ecosystem, CIL has started an out-of-the-box initiative of segregating sand from overburden formations.

Three OB to sand conversion projects presently operated by CIL’s subsidiaries produced 16,643 CuM sand till Nov FY '23.

The company is unrolling plans to set up six more projects.

All nine plants aim to produce 30 Lakh CuM sand annually once fully operational.

This makes manufactured sand available at cheaper rates and in an eco-friendly manner. The move also helps improve the riverine ecosystem, they added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.