September 05, 2026 11:34 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Influencer Swatantra Bhardwaj, accused of assaulting CJP protester's father, detained in UP | Yasin Malik’s double shock from jail: Announces divorce, refuses to defend himself in Sarla Bhat case | Sonia Gandhi’s memoir finds new publisher as HarperCollins steps in amid Penguin row | 1,000 RSS-backed schools in Bengal? Suvendu Adhikari sets one-year target | PM Modi hails Giorgia Meloni on becoming longest-serving postwar Italian PM | HarperCollins to publish Sonia Gandhi’s memoir amid Penguin row | Supreme Court slams Bar Council of India over NALSAR row: ‘No power to take action against law students’ | ‘Technical error, not U-turn’: Kerala CM Satheesan denies deleting video slamming cleric’s women remarks after Islamic Scholars’ meet | Bombay HC orders CBI probe into Sushant Singh Rajput's ex-manager Disha Salian's death case | Vijay for PM in 2029? TVK says Rahul Gandhi will ‘hold his hand’ to make him Prime Minister
UNI

BHEL clinches order for 40 MW Rahughat Hydroelectric Project in Nepal

| @indiablooms | Feb 03, 2020, at 05:35 pm

Mumbai/UNI:  BHEL has won an order for the ElectroMechanical (EM) works for the 40 MW Rahughat Hydroelectric Project in Nepal.

The order has been placed on BHEL by the Raghuganga Hydropower Limited (RGHPL), a company 100 per cent owned by Nepal Electricity Authority (NEA) the sole public power utility in Nepal and owned by the Nepal government.

The project is majority funded by EXIM Bank of India in the form of a soft loan, along with funding from NEA and the Nepal government. WAPCOS, India is the project consultant, BHEL said in a filing with BSE.

The order for Rahughat HER, located in the Raghuganga municipality of Myagdi district of Nepal, envisages design, engineering, manufacturing, supply, erection and commissioning of the complete electro-mechanical package involving supply of two Vertical Pelton Turbines (20 MW each) along with associated equipment, matching generators, governors, controls & instrumentation, protection system, transformers, 220 KV switchyard and balance of plant (BoP) packages.

Major equipment for the contract will be manufactured and supplied by BHEL's plants at Bhopal, Jhansi, Rudrapur and Bengaluru, while the installation activities onsite will be carried out by the company's Power Sector - Northern Region division, Noida.

This is the second consecutive success for BHEL in the hydro power sector of Nepal. Last year, BHEL had won a prestigious order for the largest Hydropower project in Nepal - 900 MW Arun-3 HEP, which is presently under construction.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.