September 08, 2026 02:36 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘No one can dictate what Bengalis eat’: BJP’s blunt message amid Bageshwar Baba’s Durga Puja food row | Delhi hostel collapse: Owner detained after seven die in Satya Niketan tragedy | No Muslims, Aadhaar card and tilak mandatory: VHP lays down rules for Garba, Dandiya in Maharashtra | 'No non-veg near Durga Puja pandals': Bageshwar Baba's big Bengal appeal sparks controversy | 'Law will take its action': Vijay's zero tolerance on insulting women weeks after Udhayanidhi's arrest | Delhi Metro's big warning to content creators: Don't try this viral stunt or face action | Hindutva influencer Swatantra Bhardwaj detained after viral assault clip; Chirag Paswan’s party files complaint for ‘falsely’ naming him | Bengaluru horror: Woman stripped, assaulted and filmed over unpaid loan interest; 4 arrested | West Bengal CM's big warning: Teacher suspended over tilak row, govt employee punished for PM Modi post | Tragedy on Kerala Highway: 8 Tamil Nadu students killed after car crashes into parked lorry

Essar's Raniganj Coal Bed Methane asset in WB crosses 0.5 million scmd production

| | Apr 06, 2015, at 09:30 pm
Mumbai, Apr 6 (IBNS) : Essar Oil, a leading player in India's Oil & Gas Sector, on Monday said that gas production at its Raniganj Asset in West Bengal has crossed 0.5 million standard cubic metres per day (scmd), thereby making it India’s largest CBM gas producer.

While nearly 100 wells have been already placed on gas production, additional 155 wells have been drilled and are at various stages of the hydrofracking-completion-dewatering cycle for further gas production ramp up.

The company has built a high quality infrastructure gas conditioning and compression stations, in-field pipelines of 120 kms. and last mile pipeline connectivity network to end users of approx. 60 kms.

The company anticipates completing the development program ahead of the May 2016 deadline as per the Contract with the Government of India.

With a total investment outlay of approx. INR 4000 crores, the Raniganj Project is a first of its kind in India aimed to responsibly produce Methane Gas from the coal seams located 1000 meters or deeper below the ground.

Gas from this Project shall be the feedstock to the priority fertiliser sector with the anchor customer being Matix Fertiliser & Chemicals Ltd., having the world’s largest single stream plant for ammonia and urea located in West Bengal.

“With unity of conception, technology and team effort, we have been able to register a multifold increase in CBM production to 0.55 million scmd and expect to ramp up delivery to 1.2 million scmd over the next few months by bringing wells on production stream which are drilled and presently under completion and dewatering phase," said Manish Maheshwari, CEO-E&P, Essar Oil.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.