April 27, 2026 06:00 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
YouTuber Saleem Wastik arrested in connection with 1995 kidnapping and murder case | Maharashtra Police makes first arrest months after Akshay Kumar revealed daughter’s cyber harassment | Big political shake-up: KCR’s daughter Kavitha floats new TRS after BRS fallout | ED raids multiple Bengal locations in PDS scam probe amid assembly polls | Bengal polls: Mob attacks central forces, 3 CAPF personnel injured in Birbhum | ‘People voting to protect their rights’: Mamata says high turnout backs TMC in Bengal | ‘Fear is being defeated’: PM Modi says high voter turnout signals BJP win in Bengal | Crude bomb attack in Murshidabad’s Nowda as violence hits Bengal polling | ‘Mamata Banerjee’s politics fuelled BJP growth in Bengal’: Rahul Gandhi | 'Will never forget’: Nation remembers Pahalgam victims as leaders vow strong fight against terror

GRSE lays the keel of the first large survey vessel

| @indiablooms | Nov 08, 2019, at 06:14 pm

Kolkata: Garden Reach Shipbuilders and Engineers Ltd., (GRSE), Kolkata at their Main Works here laid the keel of the first  Survey Vessel (Large) (Yard 3025).

Jadav Sarkar, Structural Fitter (SK-II) of GRSE, performed the keel laying in the  presence of Vice Admiral Ajay Kumar Saxena, PVSM, AVSM, VSM, Controller of Warship Production & Acquisition. The occasion was graced by Rear Admiral VK Saxena, IN (Retd.), Chairman & Managing Director, GRSE, Cmde. P R Hari, Director (Personnel) and Cmde. Sanjeev Nayyar, IN (Retd), Director (Shipbuilding).

This first ship is part of the four Large Survey Vessels order won by GRSE in competitive bidding process in Oct 2018.

The Contract for four Survey Vessel Large (SVL) was signed on 30 Oct 2018 between Garden Reach Shipbuilders & Engineers Limited (GRSE) and Government of India, Ministry of Defence for an order value of Rs. 2435.15 crore. The first ship is to be delivered within 36 months from contract signing date with a project completion time of 54 months.

The vessel is 110m long with deep displacement of 3300 Tons which can accommodate 231 personnel. The vessel shall have a cruising speed of 16 knots. GRSE’s denovo Hull Form Design imparts a superior level of operational efficiency to these vessels.

The Hull form of these new generations Survey Vessel also meets the stringent seakeeping and manoeuvring requirements including Helicopter Operations at high sea states. With their State-of-the-Art “Survey Payload” comprising of Autonomous Underwater Vehicles (AUVs), Remote Operated Vehicles (ROVs), Multi Beam Echo Sounders etc, these Survey Ships would prove to be a game changer in the Indian Navy’s Capabilities for Coastal and Deepwater Hydrographic Surveys aiding Maritime Operations.

In their secondary role, they will be capable of performing limited search and rescue, limited ocean research and operate as hospital ship/ casualty holding ships.

The design of the ship is by GRSE’s in-house Design Unit which was accorded Centre of Excellence Unit status by Department of Scientific & Industrial Research (DSIR), Ministry of Science & Technology  as it truly signifies “Make In India” Initiative of the Govt. of India.

Vessels will be built as per Classification Society Rules and Naval Ship Regulations and will conform to latest MARPOL (Marine Pollution) Standards of the International Maritime Organization (IMO).
.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm