September 07, 2026 03:29 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Hindutva influencer Swatantra Bhardwaj detained after viral assault clip; Chirag Paswan’s party files complaint for ‘falsely’ naming him | Bengaluru horror: Woman stripped, assaulted and filmed over unpaid loan interest; 4 arrested | West Bengal CM's big warning: Teacher suspended over tilak row, govt employee punished for PM Modi post | Tragedy on Kerala Highway: 8 Tamil Nadu students killed after car crashes into parked lorry | Influencer Swatantra Bhardwaj, accused of assaulting CJP protester's father, detained in UP | Yasin Malik’s double shock from jail: Announces divorce, refuses to defend himself in Sarla Bhat case | Sonia Gandhi’s memoir finds new publisher as HarperCollins steps in amid Penguin row | 1,000 RSS-backed schools in Bengal? Suvendu Adhikari sets one-year target | PM Modi hails Giorgia Meloni on becoming longest-serving postwar Italian PM | HarperCollins to publish Sonia Gandhi’s memoir amid Penguin row

Kamarajar Port awards work for modification of iron ore terminal for handling coal

| | Jul 14, 2016, at 07:28 pm
Chennai, Jul 14 (IBNS): Kamarajar Port Limited has signed a Concession Agreement with SICAL Iron Ore Terminal Limited (SIOTL) for modification of its iron ore terminal so that it can handle Common User Coal, the Ministry of Shipping informed on Thursday.
Kamarajar Port, earlier known as the Ennore Port, is about 25km north of Chennai Port.
 
The decision for modification of the terminal was taken against the backdrop of the ban on export of iron ore by the state government of Karnataka and the Supreme Court. 
 
KPL had entered into a contract with SIOTL in September 2006 for building the iron ore terminal on 30 years Built-Operate-Transfer basis with an approved project cost of Rs 480 crores in two phases of 6 million tonnes each . 
 
The Licensee developed the first phase of 6 MTPA capacity at an investment of Rs 360 crores. The revenue share was offered at 51.60 per cent. However, the commissioning activities were stalled due to the ban on iron ore export. 
 
KPL, therefore, decided to convert the terminal to handle Common User Coal in the said Terminal. 
 
After obtaining necessary approvals from the government, bidding process was initiated for modification of existing iron ore terminal on “as is where is” to also handle Common User Coal at Kamarajar Port on Design-Built –Finance-Operate-Transfer) basis. 
 
SIOTL has offered a revenue share of 55.524 per cent. 
 
The conversion work will commence in October 2016 and will be commissioned within twelve months from the date of commencement of work, the ministry said. 
 

Image: Kamarajar Port Ltd website

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.