December 12, 2024 06:26 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Donald Trump vows to eliminate birthright citizenship after taking charge | No alliance with Congress in Delhi polls: AAP chief Arvind Kejriwal | Bengaluru techie's suicide: Atul Subhash's wife and her family booked | Bengaluru techie's suicide: Atul Subhash's wife and her family booked | INDIA bloc to knock on Supreme Court's doors over alleged EVM manipulation during Maharashtra polls | 'Babri Masjid should be rebuilt in Bengal's Murshidabad': TMC MLA Humayun Kabir sparks row | Rajnath Singh calls on Russian Prez Vladimir Putin in Moscow, discusses bilateral defence cooperation | Police to investigate conspiracy angle in Mumbai bus accident that killed 7 | Mamata Banerjee should lead INDIA bloc: Lalu Prasad Yadav | Opposition moves no-confidence motion against VP Jagdeep Dhankar in RS
EMC
Image Credit: Wallpaper cave

Karnataka: Centre approves Rs 180 cr project to set up Electronics Manufacturing Cluster at Hubli-Dharwad region

| @indiablooms | Mar 25, 2023, at 05:04 am

Bengaluru/IBNS: The Centre has approved Rs 180 crore worth of Electronics Manufacturing Cluster (EMC) at Karnataka’s Dharwad which is expected to create over 18,000 jobs, Union Minister Rajeev Chandrasekhar said on Friday.

The project, which is being set up at Kotur-Balur Industrial Area in Dharwad District of Karnataka under the EMC 2.0 scheme, is expected to catalyse investments to the tune of over Rs 1,500 crore soon, said Chandrasekhar, who is the minister of state for Skill Development & Entrepreneurship, and Electronics & IT.

Nine companies, including start-ups have already committed to make investment of Rs 340 crore with employment potential of 2,500 people.

“Karnataka is emerging as a global Electronics manufacturing hub for the world, just as it is already a telecom hub with Apple plants in Kolar (Wistron) and Devanahalli (Foxconn). These new investments are creating jobs and development,” the minister said.

This EMC has a strategic locational advantage and is well connected with NH -48 (1 Km), and Hubli Domestic Airport (33 Km) which will reduce the logistics/ transportation cost of the industry in the EMC, he highlighted.

The Centre has already approved a Common Facility Centre (CFC) for the development of an advanced testing facility in Mysore, Karnataka that will meet the various testing requirement of the industry.

The Modified Electronics Manufacturing Cluster (EMC 2.0) scheme was introduced on 1st April 2020 with the objective to create world-class infrastructure along with common testing facilities, including Ready Built Factory sheds/Plug & Play infrastructure for attracting Anchor unit along with their supply chain to set up their manufacturing/production facility in the country.

Under the Scheme, three Electronics Manufacturing Clusters over an area of 1,337 acres with project cost of Rs 1,903 crore, including Central financial assistance of Rs 889 crore have been approved which projected investment target of Rs 20,910 crore, Chandrasekhar said.

As a result of these initiatives, India has come a long way in electronics manufacturing in the past eight years, the minister added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.