December 12, 2024 04:51 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Donald Trump vows to eliminate birthright citizenship after taking charge | No alliance with Congress in Delhi polls: AAP chief Arvind Kejriwal | Bengaluru techie's suicide: Atul Subhash's wife and her family booked | Bengaluru techie's suicide: Atul Subhash's wife and her family booked | INDIA bloc to knock on Supreme Court's doors over alleged EVM manipulation during Maharashtra polls | 'Babri Masjid should be rebuilt in Bengal's Murshidabad': TMC MLA Humayun Kabir sparks row | Rajnath Singh calls on Russian Prez Vladimir Putin in Moscow, discusses bilateral defence cooperation | Police to investigate conspiracy angle in Mumbai bus accident that killed 7 | Mamata Banerjee should lead INDIA bloc: Lalu Prasad Yadav | Opposition moves no-confidence motion against VP Jagdeep Dhankar in RS

L&T grabs 2x660 MW power project order in Bihar

| @indiablooms | Jun 24, 2019, at 05:26 pm

Mumbai, Jun 24 (UNI) Engineering Major, Larsen & Toubro (L&T) said its power business has bagged a mega engineering, procurement and construction (EPC) order from SJVN Thermal Private Limited to set up a 2x660 MW ultra-supercritical power plant in Buxar district, Bihar.

SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN Limited, a joint venture of the Government of India and the Government of Himachal Pradesh and a Mini Ratna public sector undertaking.

Prime Minister Narendra Modi had laid the foundation stone for the plant in March this year, company said in a filing with BSE.

The scope of work for L&T includes Design, Engineering, Manufacture, Procurement, Supply, Construction, Erection, Testing a Commissioning of Buxar Thermal Power Project (2x660 MW), on turnkey basis,covering steam generator, steam turbine generator, electrostatic precipitator, NOx control system, flue gas desulphurization (FGD) system and complete balance of plant (BoP) systems, including raw

water intake system, make-up water system, coal Et ash handling system, ash dyke, complete Eal system including switchyard and complete civil, structural and architectural works.

Commenting on the order, Shailendra Roy, CEO & Managing Director, L&T Power & WholeTime Director - L&T, said, 'L&T is honoured to take on the responsibility of executing this prestigious project.

Knowing the importance of this project for the state of Bihar, L&T shall aim to set new benchmarks in completion schedule, quality, safety and equipment / system performance. With majority of the equipment including boilers, turbines, generators, etc, being made locally in our world class manufacturing facilities at Hazira, this project will also go a long way in accomplishing the 'Make in India'initiative promoted by the Prime Minister." 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.