September 02, 2026 06:47 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
CJP calls off Sept 5 Delhi march after Supreme Court quashes FIRs against protesters | ‘Dismantle entire terror ecosystem’: Modi’s strong message at SCO Summit in Shehbaz’s presence | Modi’s big appeal after 7.8% GDP growth: ‘Don’t travel abroad, avoid destination weddings’ | Modi-Pezeshkian talks: Iran seeks India’s 'extensive contacts' to end West Asia war | Indus Waters Treaty row: India rejects Hague court order, says ‘no jurisdiction’ over its sovereign decisions | India beats the odds with 7.8% GDP growth; PM Modi has a message for critics | PM Modi meets Iranian President Masoud Pezeshkian during SCO summit in Kyrgyzstan | ‘Islam superior to all religions’: Karnataka minister’s remark sparks BJP-Congress war; resignation demand grows | PM Modi meets Iran's President Masoud Pezeshkian during SCO summit in Kyrgyzstan | VHP breaks silence on Durga Puja ‘guidelines’: No blanket non-veg ban, clarifies stand on theme pandals amid backlash
NTPC
Image Credit: Michal Malton via Unsplash

NTPC Coal mining output jumps 61 pc YoY to 42.40 lakh MT Q1FY23

| @indiablooms | Jul 06, 2022, at 02:53 am

Mumbai: State-owned power giant NTPC Tuesday said its coal output jumped 61 percent in the first quarter of FY23 at 42.40 lakh Metric Ton (MT) against 26.40 lakh MT produced in the same period last year.

"The three operational coal mines --  Pakri-Barwadih (Jharkhand), Dulanga (Odisha) and Talaipalli (Chhattisgarh) have contributed to achieving 42.40 lakh metric tonnes of coal production," an NTPC statement said.

The production of coal during the month of June 2022 was 15.55 lakh MT 101 percent over the coal production of 7.73 MMT achieved in June 2021.

Along with this coal production, NTPC has also contributed to the removal of 106 Lakh cubic meter and coal despatch of 41.74 lakh MT to NTPC power plants, in this quarter.

NTPC has started mining operations in its Chatti-Bariatu coal mine (Jharkhand) and has also touched coal on May 21, 2022.

The coal from this mine will be supplied to the Barh Power Station of NTPC.

NTPC was awarded the operation contract for Talaipalli (West Pit) (Chhattisgarh) on June 30, 2022, the company said and added that the mining operations in this pit will commence soon.

NTPC’s Coal Mining Division has signed an MoU with MECON on Jun 2 for consultancy and project management services for its coal mines.

Being a signatory to the prestigious United Nations Global Compact's CEO Water Mandate, the NTPC has engaged the National Institute of Hydrology, Roorkee for assessing the potential of rainwater harvesting, design of the rainwater harvesting structure in Talaipalli township area and water positivity in the 2 villages around the township.

The coal mining headquarters in Ranchi has developed and procured safety reflective jackets with LED lights through MSME vendor in June 2022 to ensure improved visibility for personnel deployed in mines and siding during night hours.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.