September 04, 2026 06:32 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Supreme Court slams Bar Council of India over NALSAR row: ‘No power to take action against law students’ | ‘Technical error, not U-turn’: Kerala CM Satheesan denies deleting video slamming cleric’s women remarks after Islamic Scholars’ meet | Bombay HC orders CBI probe into Sushant Singh Rajput's ex-manager Disha Salian's death case | Vijay for PM in 2029? TVK says Rahul Gandhi will ‘hold his hand’ to make him Prime Minister | CJP calls off Sept 5 Delhi march after Supreme Court quashes FIRs against protesters | ‘Dismantle entire terror ecosystem’: Modi’s strong message at SCO Summit in Shehbaz’s presence | Modi’s big appeal after 7.8% GDP growth: ‘Don’t travel abroad, avoid destination weddings’ | Modi-Pezeshkian talks: Iran seeks India’s 'extensive contacts' to end West Asia war | Indus Waters Treaty row: India rejects Hague court order, says ‘no jurisdiction’ over its sovereign decisions | India beats the odds with 7.8% GDP growth; PM Modi has a message for critics
NTPC
Image: Wikimedia Commons

NTPC invites online bids for EPC Package of Waste to Energy Facility in Varanasi

| @indiablooms | Jul 16, 2021, at 11:25 pm

New Delhi: NTPC Vidyut Vyapar Nigam Limited, a wholly-owned subsidiary of NTPC Limited, has invited online bids on a “two-stage” bidding basis for the EPC Package of Waste to Energy Facility at Ramna, Varanasi.

The bid commenced on 22nd June 2021 and will conclude on 27th July 2021. The Varanasi Waste to Energy (WTE) facility is expected to be commissioned by 30th September, 2022.

A Waste to Energy plant with waste segregation facility of 600 TPD fresh Municipal Solid Waste will be installed under the project. The plan will be designed in a modular fashion for assembly, testing, maintenance and replacement of individual sub-assemblies.

The complete plant will be odourless and compliant to applicable emission norm. The plant will be surrounded by an aesthetic environment with permissible noise limits. Also, it will be undergoing an effluent and leachate treatment system to prevent the discharge of harmful substances. Further, human exposure will be limited with a fair amount of automation processes will be deployed around the plant in its operation and maintenance.

NTPC has installed a demo/pilot torrefaction plant at Dadri Stage -1 which uses agriculture residue / MSW as feedstock. This plant deploys “torrefaction” process where MSW is heated in absence of oxygen. The plant which was commissioned in March 2020 presently produces charcoal has a GCV in the range of 4000-5000 kcal/kg.

To promote the torrefaction technology, a Green Charcoal Hackathon was launched on 1st December 2020 with a vision to create a conducive environment by reducing carbon emissions and nurture technology solutions in India.

Based on the outcome of the Green Charcoal Hackathon, the Notice Inviting Tender (NIT) of Varanasi Waste to Energy (WTE) facility has been floated on 22nd June, 2021. The Waste to Energy facility will have a receiving shed/pit, a segregation facility, a sealed reactor and its auxiliaries, an emissions control system, an electrical and C&I system, civil works, a post-torrefaction / char handling facility and O&M of two years.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.