October 20, 2026 11:31 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Operation completed’: Tiger Shroff shooters allegedly alerted handlers after firing, probe reveals | 'I don't mind saying sorry 1,000 times': Sonu Nigam apologises to Kannadigas over ‘Pahalgam’ remark amid concert ban demand | After Vijay, is Dhanush eyeing politics? TVK calls Thalapathy an inspiration | Trump Says Paris Will Become ‘Muslim City Very Soon’, Blames Macron’s Immigration Policies | Four killed in fresh Manipur violence as protesters take bodies to Chief Minister’s residence | Tiger Shroff firing: Three accused arrested on train in Rajasthan, suspected Bishnoi gang link emerges | 'Internet access a fundamental right for children': SC rejects age-based 'blanket' ban | 'We will fight our own government': RG Kar victim's father threatens fresh protest after Sandip Ghosh gets bail | RG Kar shocker: Sandip Ghosh gets bail as only 7 of 147 witnesses examined, junior doctor blasts CBI | Trump waives Russia-related sanctions
In Bihar, NTPC currently operates with an installed capacity of 8,850 MW.

NTPC to set up nuclear power project in Bihar

| @indiablooms | Dec 19, 2024, at 10:08 pm

Patna: Power giant NTPC is planning to establish a nuclear power project in Bihar, marking a significant step in expanding its non-fossil energy portfolio, Chairman and Managing Director Gurdeep Singh said on Thursday.

Speaking at the 'Bihar Business Connect 2024' summit, Singh said NTPC has requested the state government to allocate suitable land for the project, reported The Economic Times.

"Looking at the future of the energy sector, nuclear (energy) is expected to become extremely important 20-30 years down the line. I want to share that NTPC is now entering the nuclear energy space," Singh was quoted as saying by ET.

Although he did not provide additional details, Singh mentioned that NTPC would first conduct a study before advancing the nuclear project in the state.

On September 11, the Indian government approved the creation of Anushakti Vidhyut Nigam Ltd (ASHVINI), a joint venture between Nuclear Power Corporation of India Ltd (51%) and NTPC (49%), to build, own, and operate nuclear power plants under the Atomic Energy Act.

Singh also highlighted NTPC’s interest in other renewable energy initiatives in Bihar, including rooftop, ground-mounted, and floating solar projects, pumped storage, and battery energy storage systems.

"We aim for a significant share of our 60,000 MW renewable energy capacity by 2032 to be in Bihar," he said.

In Bihar, NTPC currently operates with an installed capacity of 8,850 MW, representing an investment of approximately Rs 80,000 crore.

Singh further revealed plans to explore battery storage systems of 3,000-4,000 MWh in the state and noted that Nabinagar Power Generating Company Ltd (NPGCL) is working on a 2,400 MW power project in Bihar.

As of now, NTPC’s total installed capacity across thermal, solar, wind, and other sources stands at 76,531 MW.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.