October 23, 2026 11:42 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tiger Shroff, not Salman Khan, was the main target, probe reveals shocking details | Dammam airport attack: Indian killed, two compatriots injured as Saudi Arabia faces fresh strikes | ‘Among others’: Macron takes swipe at Trump over France unrest, calls foreign leaders’ remarks ‘stupid’ | ‘Specific threat-related inputs’: Delhi Police blocks Diljit Dosanjh’s Delhi concert | ‘Barbaad kare alfaz mere’: Ranbir Kapoor apologises for Dussehra gaffe in Kolkata | Delhi court releases CJP's Saurav Das and Ashutosh Ranka after 7 days in custody | ‘We are seeing what is happening outside our country’: Delhi HC judge’s remark as CJP leaders Saurav Das and Ashutosh Ranka withdraw custody plea | Salman Khan was the original target? Tiger Shroff firing probe reveals shocking twist | ‘UN experts are an oxymoron’: Marco Rubio takes swipe at UN, refuses to comment on India's protests | ‘US ties with no country come at India's expense’: Marco Rubio addresses concerns over Pakistan, China
ONGC

ONGC's Coal Bed Methane block in Bokaro commissions new Gas Collecting Station

| @indiablooms | Apr 12, 2023, at 12:41 am

Mumbai: Oil and Natural Gas Corporation Limited (ONGC) on Tuesday has successfully commissioned a new Gas Collecting Station (GCS) in its Bokaro Coal Bed Methane block.

It is the first gas collecting cum gas compression station in the Bokaro CBM (Coal Bed Methane) Block.

This marks a major achievement in bringing ONGC on the CBM map of India as a bulk CBM producer.

GCS-Bokaro is a major production installation in Patch-A of Bokaro CBM Block of ONGC-IOCL Joint Venture (Participating Interest: 80:20) with ONGC as the JV operator.

CBM Asset has executed a tie-in agreement with GAIL for pipeline connectivity with its Urja Ganga Pipeline for the sale of gas from GCS-Bokaro. In addition, the Asset has facilitated the signing of Gas Sales Agreements (GSAs) with five gas customers, realizing the highest-ever premium of USD 7.1 per MMBTU over Brent linked base crude oil price of ~USD 14 per MMBTU.

The GCS- Bokaro project, including its well site facilities and pipeline network was conceived by CBM Asset and executed by the consortium of M/s Tata Projects Limited and M/s Corrtech International Pvt. Ltd. under a contract awarded by OES, Delhi. The total cost of the project is around Rs.441 crore.

GCS-Bokaro is designed to process 1 MMSCMD of CBM gas and handle 750 m3/day of produced water. The installation is equipped with state-of-the-art technology, including gas and water-headers, gas separator, gas filters, Dresser-Rand Make Process Gas compressors, Molecular Sieve based Gas Dehydration Unit, flare system with remote ignition, produced water handling system, RO system, captive power generation system, instrument air system, cooling water and fire-fighting systems, among others.

Currently, 55 wells are connected with GCS-Bokaro and are flowing well fluids, including CBM gas and produced water, which have been used for the PGTR (Performance Guarantee Test Run) and commissioning of the installation. Unlike conventional gas wells, CBM wells require dewatering through artificial lift pumps before achieving sustained gas production.

The successful mammoth task of commissioning of GCS-Bokaro is a result of meticulous planning, round-the-clock operations, supervision, monitoring, and coordination among various teams from across diverse disciplines.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.