December 13, 2024 22:30 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengaluru techie suicide: Karnataka Police issues summons to wife Nikita, her family members | French President Macron appoints centrist leader Francois Bayrou as new Prime Minister | Congress always prioritised personal interest over Constitution: Rajnath Singh | Jaishankar calls attack on Hindus in Bangladesh 'a source of concern' | Allu Arjun arrested over woman's death in stampede during Pushpa 2 premiere show | RBI receives bomb threat in Russian language, case filed | UP teenager kills mother, lives with body for 5 days | At least six people including a child killed in Tamil Nadu hospital fire | Amid Atul Subhash row, SC says mere harassment is not enough to prove abetment to suicide | India's D Gukesh becomes youngest ever world champion in chess

Piyush Goyal reviews coal production and dispatches to generate adequate power supply for country

| @indiablooms | May 18, 2018, at 11:52 pm

New Delhi, may 18 (IBNS): Union Minister of Railways and Coal,  Piyush Goyal chaired a detailed review meeting with R.K. Singh, Minister of State (IC) Power and New & Renewable Energy and with top officials of Ministries of Coal, Railways and Power in New Delhi on Friday.

In the meeting, review of Power supply requirement during the ongoing summer and forthcoming winter season was carried out.

Various short term, medium term and long term measures were discussed in detail to improve the coal stock position in Power Plants of the country.

Comprehensive review of targets for coal production and dispatches by the coal companies is carried out. 

Piyush Goyal stressed on the necessity to increase Plant Load Factor (PLF) of various Power Plants of the country. He said that all pithead plants with sufficient coal supply should run at 100% PLF.

He expressed the desire to hold fortnightly meeting of the ministries involved, to review the power situation in the country.

He stressed on the need for States located far from mines to use provisions under “Flexibility of utilization of Coal” rules, so that this coal can be used by those power stations near the coal source .

Gujarat and Maharashtra have already been using these provisions.

This will enable cheaper power to the respective States and efficient utilization of rolling stock enabling coal supply for other power stations.

He gave clear instructions to the officials of the three ministries to keep a close vigil on the power production and supply situation in the country and to keep in close touch with Chief Secretaries and Power Secretaries of the States for this purpose.

Goyal expressed the need to improve the turnaround time of rakes by better scheduling of trains and optimum utilization of traffic blocks.

He expressed the need to rationalize operational and maintenance practices on the high density routes of Indian Railways.

He stressed on reducing terminal detention of wagons inside Power Plants and Coal sidings to generate extra capacity.

Last but not the least, he emphasized that team effort, better coordination between Ministries involved and the rationalization of work procedures will lead to generation of extra capacity within the existing system and ensure 24X7 power supply for the people of India.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.