September 07, 2026 07:33 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘No one can dictate what Bengalis eat’: BJP’s blunt message amid Bageshwar Baba’s Durga Puja food row | Delhi hostel collapse: Owner detained after seven die in Satya Niketan tragedy | No Muslims, Aadhaar card and tilak mandatory: VHP lays down rules for Garba, Dandiya in Maharashtra | 'No non-veg near Durga Puja pandals': Bageshwar Baba's big Bengal appeal sparks controversy | 'Law will take its action': Vijay's zero tolerance on insulting women weeks after Udhayanidhi's arrest | Delhi Metro's big warning to content creators: Don't try this viral stunt or face action | Hindutva influencer Swatantra Bhardwaj detained after viral assault clip; Chirag Paswan’s party files complaint for ‘falsely’ naming him | Bengaluru horror: Woman stripped, assaulted and filmed over unpaid loan interest; 4 arrested | West Bengal CM's big warning: Teacher suspended over tilak row, govt employee punished for PM Modi post | Tragedy on Kerala Highway: 8 Tamil Nadu students killed after car crashes into parked lorry

Tata Power commissions pre-fabricated power distribution centre for Mumbai city

| | Apr 12, 2016, at 08:52 pm
Mumbai, Apr 12 (IBNS) Tata Power, India’s leading integrated power company, announced on Tuesday, that it has commissioned India's first pre-fabricated 33/11 kV Power Distribution Centre (PDC) for its consumers of Mumbai city
Tata Power has designed and developed this PDC in collaboration with ABB
 
The PDC is a pre-fabricated modular enclosure that houses the MV Switchgear, LV switchgear and auxiliary equipment. 
 
According to the company, this engineered solution has been innovated to overcome the major challenges faced in rapidly growing cities and urban areas. Tata Power has been able to reduce the footprint of the 33 /11KV substation by almost 30%, civil cost of construction by 82% as well as the gestation period of establishing the substation by two months.
 
Commenting on the development, Ashok Sethi COO and ED, Tata Power stated, “Recognized as India’s largest integrated power company, with a reputation for trustworthiness, built up over ten decades, Tata Power has always strived to provide superior customer service in line with International standards. The technological innovations undertaken by us reinforce our commitment to achieve customer satisfaction and delight. Recently, we have also introduced other innovative solutions such as India's First Natural Ester filled transformers, Self- protected Pad mount Substation amongst others. This newly engineered solution, PDC, not only it combats space crunch issues but also enhances public safety. This will not only be beneficial for our consumers but also for the power industry. We will continue to work on further innovations in technology to ensure uninterrupted services to our consumers.”
 
Sanjeev Sharma, Country Managing Director of ABB India Ltd said “It is our privilege to work with Tata Power in a spirit of strategic collaboration to develop innovative technology solutions. ABB’s state of the art portfolio of solutions and services that can adapt to evolving requirements of customers makes it well placed to partner Tata Power’s focus on continuous improvements."
 
The company also highlighted as the PDC is completely inaccessible from outside, its use also enhanced safety for the public. 
 
Image: Tata Power’s first pre-fabricated 33/11 kV Power Distribution Centre.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.