August 29, 2026 04:26 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Clean my shoes’: Greater Noida woman detained after alleged abuse, assault of security guards | 21-year-old model stabbed to death in Delhi; gym trainer arrested after encounter | Abhishek Banerjee, Derek O'Brien, other TMC leaders booked after Camac Street clash with Kolkata Police | Kanpur plane crash: Training aircraft crashes near Ganges, two pilots killed | Big IT boost for Bengal: LTM opens global delivery & AI centre in Kolkata's New Town | 21-year-old Delhi model found stabbed at Delhi home, gym trainer accused of killing her | ‘Who is stopping her from wearing what she wants?’: Kangana Ranaut hits back at Kriti Sanon over Raksha Bandhan ad | 300 Indians missing in Nepal flash floods, 160 dead: Foreign Minister reveals grim toll | Supreme Court directs Tarun Tejpal to surrender within two weeks | Supreme Court notice to 20 rebel TMC MPs in disqualification plea

India preparing for GSLV-D6: Singh

| | Jul 24, 2014, at 03:20 am
New Delhi, July 23 (IBNS) Union Minister of State (Independent Charge) for Ministry of Science and Technology, M/o Earth Sciences, D/o Atomic Energy and D/o Space Jitendra Singh on Wednesday said the GSLV project has successfully launched GSLV-D5 flight with indigenous Cryogenic engine and stage on Jan 5 from Satish Dhawan Space Centre, Sriharikota and is currently preparing for the next flight GSLV namely, GSLV-D6.
"The GSLV-F02, GSLV-D3 and GSLV-F06 flights could not accomplish the mission objectives. Subsequently, failure analysis committees were formed to (a) carry out in-depth analysis of the flight performance and identify causes for the failure, and (b) recommend corrective measures and future course of action on the GSLV Vehicle. The failure analysis committees have submitted their recommendations," Singh said in a reply to a written question in the Lok Saha on Wednesday.  
 
He said, "Based on the suggestions made by the failure analysis committees, ISRO has implemented the modifications and improvements in GSLV, which include independent inspection and quality checks for all critical components and sub-assemblies, change of bearing housing material, revision of tolerances and seal clearances of Fuel Booster Turbo Pump of Cryogenic Engine, redesign of the Cryogenic Stage Lower Shroud, revision of connector mounting scheme and wire tunnel configuration."
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.