August 29, 2026 05:16 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Clean my shoes’: Greater Noida woman detained after alleged abuse, assault of security guards | 21-year-old model stabbed to death in Delhi; gym trainer arrested after encounter | Abhishek Banerjee, Derek O'Brien, other TMC leaders booked after Camac Street clash with Kolkata Police | Kanpur plane crash: Training aircraft crashes near Ganges, two pilots killed | Big IT boost for Bengal: LTM opens global delivery & AI centre in Kolkata's New Town | 21-year-old Delhi model found stabbed at Delhi home, gym trainer accused of killing her | ‘Who is stopping her from wearing what she wants?’: Kangana Ranaut hits back at Kriti Sanon over Raksha Bandhan ad | 300 Indians missing in Nepal flash floods, 160 dead: Foreign Minister reveals grim toll | Supreme Court directs Tarun Tejpal to surrender within two weeks | Supreme Court notice to 20 rebel TMC MPs in disqualification plea

ISRO plans new launch pad at Sriharikota

| | Mar 12, 2015, at 11:11 pm
New Delhi,Mar 12(IBNS) Indian Space Research Organisation (ISRO) proposes to set up a new launch pad, referred as Third Launch Pad, at Satish Dhawan Space Centre, Sriharikota.

MoS in the Prime Minister’s Office and Minister of State in the Ministry of Personnel, PG & Pensions, Dr Jitendra Singh said on Thursday in a reply to an unstarred question in Rajya Sabha that the third Launch Pad is intended to support increased launch frequency, launching requirements of future advanced launch vehicles and also serve as a redundant launch pad for the GSLV MIII class of vehicles. 

Detailed studies on possible concepts /options and preliminary configuration have been carried out, he said.

The possible site for the Third Launch Pad has been identified in Sriharikota taking into account the safety distances and maximal utilisation of existing launch pad facilities, the minister said. 

However, further work on design of the launch pad will be taken up at an appropriate time after finalising the configuration of the advanced launch vehicle, operationalisation of GSLV MIII, programmatic requirements and resource availability, he added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.