April 10, 2026 05:25 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Amit Shah promises UCC, ₹3,000 aid per month for women and youth in BJP’s Bengal manifesto | Nitish Kumar takes Rajya Sabha oath; power shift looms in Bihar | Sting video fallout: AIMIM snaps electoral ties with Humayun Kabir in Bengal | Israel says Hezbollah chief’s nephew-cum-secretary killed in Beirut strikes last night | Modi slams TMC on trade, fisheries at Haldia; vows 7th pay commission for govt employees | ‘US military will remain in and around Iran’: Trump amid fragile ceasefire | BJP eyes Assam hattrick, Puducherry comeback; LDF faces Kerala test | Israel claims Hezbollah chief's nephew killed in Beirut strikes last night | Jaishankar’s high-stakes diplomatic tour: EAM to visit UAE this week, first visit amid Middle East conflict | Passport row: Barricades outside Pawan Khera’s Hyderabad house after Himanta Biswa Sarma's warning

Orbital ATK conducts test of Antares first stage

| | Jun 01, 2016, at 03:00 pm
Washington, June 1 (IBNS) Orbital ATK conducted a full-power test of the upgraded first stage propulsion system of its Antares medium-class rocket using new RD-181 main engines. The 30-second test took place at 5:30 p.m. (EDT) on May 31, 2016 at Virginia Space’s Mid-Atlantic Regional Spaceport (MARS) Pad 0A.

Initial indications suggest that the test was fully successful, and the Antares engineering team will review test data over the next two weeks to confirm that all test parameters were met. The confirmation of a successful test will clear the way for Orbital ATK to resume cargo resupply services to the International Space Station from NASA’s Wallops Flight Facility in Virginia, currently scheduled for July.

“Early indications show the upgraded propulsion system, core stage and launch complex all worked together as planned,” said Mike Pinkston, Orbital ATK General Manager and Vice President, Antares Program. “Congratulations to the combined NASA, Orbital ATK and Virginia Space team on a successful test.”

The primary goal of the test was to verify the functionality of the integrated first stage, including new engines, modified Stage 1 core, avionics, thrust vector control and pad fueling systems in an operational environment, read the NASA website.

The test also met a number of operational milestones including full propellant loading sequence, launch countdown and engine ignition and shut down commands, as well as multiple throttle settings including full engine power. Additionally, the test validated the launch pad’s operation, including propellant tanking and the use of the water deluge system to protect the pad from damage and suppress noise. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.