April 02, 2026 10:12 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India | ‘Unsubstantial allegations’: Calcutta HC dismisses plea on ECI’s officer transfers in Bengal | Tennis icon Leander Paes joins BJP ahead of Bengal polls | 8 killed, several injured in crowd crush at Bihar temple in Nalanda | Trump signals exit from Iran war even as Strait of Hormuz remains shut: Report | Mystery death in Pakistan: JeM chief Masood Azhar’s brother found dead
Jhelum River Project

Srinagar Municipal Corporation starts work on Jhelum Riverfront Project

| @indiablooms | Oct 15, 2021, at 03:21 am

Srinagar/IBNS: Srinagar Municipal Corporation (SMC) under its Smart City Project has floated tenders for Jhelum Riverfront Project to develop the water body and its surrounding areas into ecologically sustainable economic hubs.

 

In this regard, the tenders for phase-I have been made public. As per tenders, the bid submission end date has been fixed on Oct 28 by 02:00 pm after which the bids will be opened on Oct 29.

As per the official documents, the River Jhelum is the spine of the city’s ecology.

"The city’s heritage and its renaissance are painted on the banks of river Jhelum in terms of historical buildings, Khanqa’s, temples, churches etc.

"However, its preservation has to be linked to the conservation of its heritage resources from Zero Bridge to Cement Kadal along both banks," the document read.

"Jhelum will be made the face of the old city which it historically used to be," it added.

The Irrigation and Flood Control Department (I&FCD) has already started the restoration of its banks under its Jhelum Riverfront Project.

However, it needs to be made broad-based and upgraded to a Jhelum Revitalization Plan.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.