September 19, 2026 04:06 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests | Gurugram biker crash: Main accused Kalyan Bainsla sent to police custody for 2 days | ‘Just tax collection’: Ashneer Grover slams new UPI charges above Rs 2,000 | India condemns Houthi attack on Saudi Arabia, warns of threat to Red Sea shipping | Gurugram biker hit by car: Two including main accused arrested after viral road rage video, attempt to murder case filed

Arunachal Pradesh CM inaugurates Daporijo bridge over video conferencing

| @indiablooms | Apr 21, 2020, at 05:51 pm

Guwahati/IBNS: Arunachal Pradesh Chief Minister Pema Khandu on Monday inaugurated the Daporijo bridge over Subansiri river over video conferencing.

The bridge on Daporijo River is a strategic link towards the LAC between India and China.

The bridge is now opened for vehicular movement.

Amid ongoing nationwide lockdown, Daporijo bridge over Subansiri river has been constructed by Border Roads Organisation (BRO), keeping in mind utmost precautions against COVID-19 so as to connect this strategic Line of Communication in Arunachal Pradesh.

All supplies, rations, constructional material and medicines pass over this bridge.

Old Bridge developed cracks which could lead to a major catastrophe like on 26 July 1992 when a passenger bus fell off the bridge leaving no survivors.

With the intervention of DGBR and CE Arunank expeditious sanctions were obtained from the Ministry of Defence (MoD) and Arunachal Pradesh government.

The difficult and dangerous launch was completed in record time adhering to all COVID-19 precautions.

Work had started for construction of the bridge on March 17 this year by 23 BRTF.

Finally, after 27 days on Apr 14, the bridge was jacked down successfully and safely on the supports.

It has been successfully upgraded from class 24 tons to class 40 tons, thereby, allowing heavier vehicles to pass catering for not only Army requirements but the future Infrastructure development requirements of Upper Subansiri district. 

Safe and early execution of the bridge represents the seamless coordination and cooperation between the BRO, MoD and Arunachal Pradesh government.

(By Hemanta Kumar Nath, Guwahati)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.