January 19, 2025 02:59 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kolkata court convicts civic volunteer Sanjoy Roy in RG Kar rape-murder case | Saif was stabbed repeatedly, he tried to protect Taimur and Jeh: Kareena Kapoor Khan records statement with police | Escaped death by 20-25 minutes: Sheikh Hasina alleges opposition wanted to kill her | Cabinet's decision on 8th Pay Commission will improve quality of life, give boost to consumption: PM Modi | 'It has been an incredibly challenging day': Kareena Kapoor Khan requests privacy after Saif Ali Khan's stabbing incident | 'Distorting history': Mamata slams Mohan Bhagwat over his Ram Temple consecration 'marking true independence' remark | Saif Ali Khan stabbing incident: Actor who received six wounds is out of danger, one accused identified | ISRO creates history docking two Indian satellites in space | US-based short seller Hindenburg Research that targeted Adani Group and SEBI chairperson to be disbanded | Saif Ali Khan stabbed during burglary attempt at home, hospitalised; police probe on
Indian Railways
Photo courtesy: UNI

Indian Railway runs track car successfully on Indo-Bangladesh line from Agartala

| @indiablooms | Aug 25, 2023, at 04:55 am

Agartala/IBNS/UNI: The Indian Railway on Tuesday made a successful run of a specially designed track car on the newly built railway line for the most ambitious cross-border connectivity between India and Bangladesh from Agartala, which will connect Kolkata via Dhaka.

Railway officials here on Wednesday said that an uninterrupted run of track cars cleared the way for a trial run of a railway engine between Agartala and Gangasagar railway stations in Akhaura, Bangladesh, which took about 75 minutes to reach the zero line at the international border.

Officials said the test train will take a few more days to finalise all necessary preparations.

However, there has been an indication that perhaps the inauguration of Indo-Bangladesh train service will happen on September 9, when the Prime Ministers of both countries will sit together in New Delhi.

The track car, responsible for laying stones on the railway line, has been operational on the route for several days, and thereafter, a trial run of the railway engine will take place, the officials stated.

Meanwhile, Sharat Sharma, head of the project on the Bangladesh side, claimed that around 6.5 kilometers of track have been laid in the Akhaura section and that the entire railway line will be ready for train movement within a week in Bangladesh.

The Ministry of Development of the Northeast Region (DoNER) sanctioned Rs 580 crore for the construction of a railway corridor of 5 km in the Indian part connecting Agartala with Bangladesh in 2016.

The Ministry of External Affairs has also funded the remaining 10 km of railway stretches in Bangladesh territory, which were supposed to be completed five years ago.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.