March 14, 2025 04:13 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
In a setback for Donald Trump, US judge orders federal agencies to rehire fired workers: Report | 'We will thwart conspiracies hatched by Centre': Revanth Reddy on delimitation exercise | Chennai doctor, his wife along with two sons die by suicide due to huge debt: Cops | Amid language debate, Tamil Nadu drops rupee symbol in state budget | Scientist killed in assault by neighbour over parking argument in Mohali | British woman tourist raped in Delhi hotel by man she befriended on social media | Gold smuggling case: Court restrains media from publishing, telecasting defamatory statements against Ranya Rao | Trump warns Putin of 'devastating' financial impacts if Russia blocks Ukraine ceasefire | 'People are going to Russia right now as we speak: Donald Trump on Ukraine war ceasefire talks | Pakistani army claims to have freed all hostages in passenger train siege; 28 personnel killed
Mumbai Metro
Image: Wikimedia Commons

Jindal Stainless supplies stainless steel for Mumbai Metro Project flagged off by PM Narendra Modi

| @indiablooms | Jan 20, 2023, at 09:51 pm

Mumbai: Giving an impetus to the government’s ‘Make in India’ initiative, the Hon’ble Prime Minister launched Phase 2 of the Mumbai Metro Line 2A and 7.

Jindal Stainless has supplied stainless steel for the outer panels, car body, structurals, roofs, interiors, underframes, and other stainless steel applications for the project.

The Mumbai Metro line was inaugurated by the PM in a Dedication Ceremony organized in Mumbai yesterday. The line will be opened for commute from today.

For this Mumbai Metro project, Jindal Stainless started supplying high-quality stainless steel grade 301LN in various tempers and in 2J finish. The supply, which started in January 2021, is expected to continue till December 2025.

Jindal Stainless is supplying material from its different manufacturing units across the country for the project.

The train sets are being developed by Bharat Earth Movers Limited (BEML) in batches and out of the total 576 coaches required for this project, 144 coaches have been supplied so far.

Approximately 5,760 metric tons of stainless steel would be consumed to develop 18.6 km 2A Metro line and 16.5 km 7 Metro line respectively.

Commenting on this development, MD, Jindal Stainless, Abhyuday Jindal, said, “As a completely recyclable metal, stainless steel is the most sustainable choice of material to enable a low-waste circular economy. We are always proud to partner metro and railway projects, playing our part in ensuring safe, sustainable, and hygienic commute for people.”

In the past, Jindal Stainless has supplied to metro projects in Sydney and Queensland, apart from Delhi, Kolkata, Bangalore, Chennai, and other metro projects. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.