May 12, 2026 04:41 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Protests erupt in Delhi after NEET UG 2026 cancellation over alleged paper leak | AIADMK cracks widen after Tamil Nadu defeat; faction backs Vijay-led TVK government | Himanta Biswa Sarma takes oath as Assam CM for second term after BJP’s landslide win | Bengali rights activist Garga Chatterjee arrested over alleged provocative remarks ahead of assembly polls | No return to full WFH yet: IT firms unlikely to change hybrid work model despite PM Modi’s appeal | Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal | Mamata govt's welfare schemes to continue: Bengal CM Suvendu Adhikari after first cabinet meeting | ‘One of life’s most emotional moments’: PM Modi performs grand Mahapuja at Somnath Temple | UPI trail cracks Suvendu Adhikari aide Chandranath Rath murder case; three arrested | Totally unacceptable: Trump rejects Iran’s peace plan in explosive showdown

Kolkata: Again subsidence noticed on Tollygunge-Karunamoyee Bridge

| @indiablooms | Sep 27, 2018, at 11:32 pm

Kolkata, Sep 27 (IBNS): Four days after the repair of a subsidence on Karunamoyee Bridge in southern Kolkata's Tollygunge area, again a small portion of the bridge caved in at the same point on Thursday evening, reports said.

After spotting the subsidence on the bridge's Tollygunge to Haridevpur flank, city traffic police covered the crack with an iron plate and cordoned off the area with guardrails to control traffic movement. 

Officials of Kolkata Metropolitan Development Authority (KMDA), which is responsible for maintaining the bridge over Tolly canal, said that its engineers will examine the crack on Friday.

Earlier on Sep 22, weeks after the Majerhat bridge disaster, a portion in an expansion joint on the bridge caved in, triggering panic among the locals.

After inspecting the scene, state Urban Development and Municipal Affairs Minister Firhad Bobby Hakim and officials from KMDA, and state Public Works Department (PWD) stated the bridge was safe to carry vehicles and KMDA engineers repaired the portion.

Four days after the maintenance work was done, another subsidence at the same point on the bridge has sparked scare among the locals and commuters.

Since the rail over bridge in southwest Kolkata's Majerhat collapsed, Tollygunge-Karunamoyee Bridge has become one of the most important links between Behala and rest parts of Kolkata, resulting an increased pressure of traffic on it.

(Reporting by Deepayan Sinha)
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.