May 12, 2026 07:24 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Protests erupt in Delhi after NEET UG 2026 cancellation over alleged paper leak | AIADMK cracks widen after Tamil Nadu defeat; faction backs Vijay-led TVK government | Himanta Biswa Sarma takes oath as Assam CM for second term after BJP’s landslide win | Bengali rights activist Garga Chatterjee arrested over alleged provocative remarks ahead of assembly polls | No return to full WFH yet: IT firms unlikely to change hybrid work model despite PM Modi’s appeal | Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal | Mamata govt's welfare schemes to continue: Bengal CM Suvendu Adhikari after first cabinet meeting | ‘One of life’s most emotional moments’: PM Modi performs grand Mahapuja at Somnath Temple | UPI trail cracks Suvendu Adhikari aide Chandranath Rath murder case; three arrested | Totally unacceptable: Trump rejects Iran’s peace plan in explosive showdown

Narendra Modi to dedicate rehabilitated Raebareli-Fatehpur-Banda section of NH-232 to the nation this week

| @indiablooms | Dec 14, 2018, at 04:23 pm

New Delhi, Dec 14 (IBNS): Indian PM Narendra Modi will dedicate to the nation the newly widened and rehabilitated Raebareli-Fatehpur-Banda section of NH-232 at an event in Raebareli on Sunday.

The 133 km project has been completed at a cost of about Rs 558 crore.

It is an important link between the mining areas of Bundelkhand, pilgrimagecentreChitrakoot, the state capital Lucknow and the Purvanchal districts of the state.

The highway sees heavy traffic carrying construction material.

When National Highways Authority of India took over this highway in 2013, it was in a very dilapidated condition and the travel from Banda to Raebareli was taking around 7 to 8 hours. After renovation, the travel time between these two cities has come down to just 2.5 hours.

The highway is two-laned with paved shoulder, and includes a4 laned stretch of 2 km in the urban part of Banda City.

There are two 2 Bypasses – an 11 km one for the city of Fatehpur and 5 km one for Lalganj, Raebareli. There are also two Rail-Over-Bridges (ROB) at Lalganj and Fatehpur.

These have been constructed using Bow String Girder technology to avoid traffic blockage on the busy Delhi Kolkata Railway Trunk Route as far as possible. There is one major bridge over river Sai spanning 90m and 2 vehicular underpasses in this section of the highway, in addition to various other small structures like RCC Box and Pipe Culverts.

Apart from drastically reducing the travel time between Banda and Rae Bareli, this highway will also cut down traffic congestion I these cities, reduce pollution and cut down fuel consumption.

The highway will also open up employment opportunities in the area and boost socio-economic development in the Purvanchal and Bundelkhand regions of the state.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.