May 03, 2025 05:41 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Pahalgam fallout: India suspends Pakistan I&B minister Ataullah Tarar's X account | India bans all imports from Pakistan in Pahalgam terror attack fallout | Yunus aide threatens Bangladesh would occupy North East states if India attacks Pakistan | Pahalgam aftermath: Pakistan test-fires ballistic missile with 450-km range amid escalation in tension with India | 'Your govt stands at a historic crossroads': Tejashwi Yadav to PM Modi on caste census move | Pahalgam attack: Supreme Court stays deportation of PoK-born man, his family with Indian passports | Cops charge OTT show's host Ajaz Khan, producer Rajkymar Pandey over 'sex positions' viral clip | 7.4 magnitude earthquake strikes off coast of Chile and Argentina, tsunami warning issued | PM Modi inaugurates Vizhinjam International Seaport in Kerala worth Rs. 8,800 crore | 'Many will get their sleep disturbed': Modi's veiled jibe at Congress over Shashi Tharoor, Pinarayi Vijayan's presence at Kerala event

Pasighat advanced landing ground gets operational

| | Aug 19, 2016, at 11:28 pm
Shillong, Aug 19 (IBNS): The upgraded Advanced Landing Ground (ALG) at Pasighat in Arunachal Pradesh was inaugurated by Kiren RijijuMoS for Home Affairs in the presence of Air Marshal C Hari Kumar AVSM VM VSM, Air Officer Commanding-in-chief (AOC-in-C), Eastern Air Command on Friday.

The event was attended by a large number of civil and military dignitaries including the Chief Secretary and Secretary Civil Aviation Arunachal Pradesh and Air Vice Marshal Manavendra Singh Vr C VSM, Senior Officer-in-Charge Administration, Eastern Air Command Shillong.

A flypast by a formation of three Sukhoi-30 MKI Air Dominance Fighter aircraft, that took off from one of the forward EAC airbases was a highlight of the event.

This was followed by a Su-30MKI also landing at the ALG.

The touchdown by a frontline fighter jet of the IAF at the ALG is a 'historic first' in the predominantly hilly state of Arunachal Pradesh, which has several ALGs at varying altitudes.

  Earlier, the AOC-in-C and other senior officials who arrived at the ALG by an An-32 aircraft from Shillong and were received by the Chief Construction Engineer (North East Project). Also, the Hon'ble Union Minister had arrived in a BSF helicopter. Thus it was a rare sight to see many different types of aircraft at this forward airfield.

The new runway surface and other infrastructure built are similar to the other upgraded ALGs that have been inaugurated in the recent months. Replete with facilities such as aprons for ground manouevering, Air Traffic Control Tower, perimeter road and a security wall, the ALG will facilitate operations of fixed wing aircraft as well as helicopters of both civil and military operators.

The ALG at Pasighat will facilitate air connectivity with rest of the country and give a huge fillip to tourism in the state of Arunachal Pradesh.


The pristine and picturesque landscape of Pasighat, on the banks of river Siang, will become accessible to rest of the world.

The unspoilt natural beauty of the area is sure to attract many a tourist, which in turn will usher in a new round of prosperity and happiness for the local population.

AAI is in the process of setting up a civil terminal, the construction of which has yet to commence. Now the need of the hour is for all agencies to get together and make it happen.

The ALG at Pasighat was taken over by the IAF in February2010. Previously, it was small strip that was partly paved, partly grassy, and reinforced with perforated steel plates. It was utilized in the past for air maintenance sorties and casualty evacuation by the IAF. Commercial helicopter operations were also being undertaken from the helipads that existed earlier.

It may be recalled that following a MoU between Government of Arunachal Pradesh and Ministry of Defence in June 2009, the IAF had embarked on an ambitious reconstruction plan to upgrade eight ALGs, including infrastructure development at an overall outlay of nearly Rs. 1,000 Crore.

The ALGs a Walong, Ziro, Along, Mechuka and Pasighat have since been upgraded and are operational now. Two ALGs at Tuting and Tawang are expected to be ready by the year end, while the ALG at Vijaynagar would undertake for reconstruction as soon as the road connectivity between Miao and Vijaynagar is restored.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Close menu