April 19, 2026 03:06 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Pushback from smartphone makers: Centre drops Aadhaar app pre-install plan — report | Meta eyes first wave of layoffs on May 20: Report | TCS breaks silence on Nida Khan: ‘No HR role, no power’ in Nashik case | ‘Panic reaction’: Rahul Gandhi on women’s bill, says PM Modi ‘wants to send a message’ | Adani Group shares rise as Gautam Adani becomes Asia’s richest, overtakes Mukesh Ambani | TCS Nashik ‘conversion’ case accused seeks anticipatory bail citing pregnancy | IT raids TMC candidate Debasish Kumar’s premises ahead of Bengal polls | Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls
Image courtesy: nhsrcl.in

Railway Minister reviews progress of India’s first undersea tunnel for bullet train

| @indiablooms | Jan 18, 2025, at 11:41 pm

Mumbai: Railway Minister Ashwini Vaishnaw on Saturday reviewed the construction of India's first undersea tunnel, part of the Mumbai-Ahmedabad High-Speed Rail Corridor, commonly known as the bullet train project.

During his visit to Ghansoli, Navi Mumbai, Vaishnaw expressed satisfaction with the progress, emphasising the transformative potential of the multi-billion-dollar initiative.

The 21-kilometre undersea tunnel, including a seven-kilometre stretch under Thane Creek, will connect Mumbai's Bandra Kurla Complex (BKC) station to Shilphata.

Trains in the tunnel will operate at speeds of 250 km/h, faster than Kolkata Metro's under-river tunnels.

Vaishnaw assured that the design prioritises safety, environmental conservation, and efficient ventilation and lighting.

“The construction of 340 kilometres of the corridor is progressing well,” he noted, adding that bridge and station infrastructure work is advancing steadily.

The BKC station will be an architectural marvel with 10 underground floors and seven above-ground levels.

Spanning 508 kilometres and featuring 12 stations across Maharashtra and Gujarat, the bullet train will significantly reduce travel time, enhance commuter productivity, and spur urban development along the corridor.

Vaishnaw described the project as an economic integration initiative, set to elevate India's infrastructure and promote growth.

He praised the contributions of Indian engineers, calling the project a national pride.

Estimated at Rs 1.08 lakh crore and powered by Japanese railway technology, the Mumbai-Ahmedabad High-Speed Rail project is expected to be completed soon, boosting the economies of cities along the route, particularly Mumbai and Ahmedabad.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.