September 19, 2026 10:58 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests | Gurugram biker crash: Main accused Kalyan Bainsla sent to police custody for 2 days | ‘Just tax collection’: Ashneer Grover slams new UPI charges above Rs 2,000 | India condemns Houthi attack on Saudi Arabia, warns of threat to Red Sea shipping | Gurugram biker hit by car: Two including main accused arrested after viral road rage video, attempt to murder case filed

Ram temple in Ayodhya: Mahaveer Seva Trust to give Rs 10 cr

| @indiablooms | Nov 11, 2019, at 05:37 pm

Ayodhya, Nov 11 (UNI) After decks have been cleared for the construction of a Ram temple in Ayodhya, various organisations joined their hands for donations and help for the construction of the temple.

Patna-based Mahaveer Seva Trust, headed by former IPS Acharya Kishore Kunal, has announced to give Rs 10 crore for the Ram temple, with giving Rs 2 crore every year for the next five years.


"We are ready to give more if required, besides, our Trust would run a Ram Rasoi, a free food supply to the pilgrims at the Ramjanmbhoomi," he said.

Meanwhile, experts feel that it will take at least five years to complete the construction of a grand Ram temple, if the work starts now with over 200 artisans working 24x7.


The work of carving stones for the temple was going on in the Ram Janmabhoomi Nyas Karyashala (workshop) since 1992 but it was stopped earlier this week.


Anubhai Sompura, the main supervisor of the workshop, told this reporter on telephone from Gujarat that the proposed temple was would be built on the design prepared by Vishwa Hindu Parishad (VHP).


“If the trust approves the same design, it will take at least five years to complete the temple,” he said.


Sompura said that the whole structure would have 250 pillars of which 106 were ready. Even the main gate is ready.


“We have enough pillars and material to start the construction. We will have to work simultaneously on two fronts – at the temple site and in workshop. Then only we will be able to complete the construction in time,” he said.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.