September 04, 2026 09:30 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Supreme Court slams Bar Council of India over NALSAR row: ‘No power to take action against law students’ | ‘Technical error, not U-turn’: Kerala CM Satheesan denies deleting video slamming cleric’s women remarks after Islamic Scholars’ meet | Bombay HC orders CBI probe into Sushant Singh Rajput's ex-manager Disha Salian's death case | Vijay for PM in 2029? TVK says Rahul Gandhi will ‘hold his hand’ to make him Prime Minister | CJP calls off Sept 5 Delhi march after Supreme Court quashes FIRs against protesters | ‘Dismantle entire terror ecosystem’: Modi’s strong message at SCO Summit in Shehbaz’s presence | Modi’s big appeal after 7.8% GDP growth: ‘Don’t travel abroad, avoid destination weddings’ | Modi-Pezeshkian talks: Iran seeks India’s 'extensive contacts' to end West Asia war | Indus Waters Treaty row: India rejects Hague court order, says ‘no jurisdiction’ over its sovereign decisions | India beats the odds with 7.8% GDP growth; PM Modi has a message for critics
Tunnel Collapse
Image of rescue ops tweeted by Uttarkashi Police

Uttarakhand tunnel collapse: Operation to rescue 41 trapped workers in final phase

| @indiablooms | Nov 23, 2023, at 06:50 pm

The operation to rescue 41 workers, who are trapped under the debris caused by a collapsed tunnel in Uttarakhand's Uttarkashi, has reached its final phase, media reports said.

The rescue teams at midnight said about 10 metres of debris is now separating them from the workers who are trapped for 12 days, NDTV reported.

Forty-one ambulances have been kept outside to carry the trapped workers to take to hospital.

Other factors like the difference in temperature between the tunnel and outside, the workers' psychological impact have been kept in mind.

A doctor along with the National Disaster Response Force (NDRF) team will reach the workers and check their conditions once the rescue pipe reaches them.

The workers will walk through the pipe under close supervision of the NDRF, NDTV reported.

The labourers have been trapped in a 400-metre buffer zone of the unfinished main tunnel since November 12 when a portion of the 4.5-km tunnel on the Brahmakal-Yamunotri National Highway collapsed, trapping 41 workers.

The tunnel - meant to join Silkyara and Dandalgaon in Uttarkashi - is a part of the Char Dham project.

On Monday morning, a wider pipe was installed to deliver a wider variety of food and medicine to the trapped people. Earlier, only dry fruits could be sent in.

The rescue ops involved an international tunneling expert team and a robotics team from defence research organization (DRDO).

Over the last week, several plans to cut through the 40-meter rock wall fell through.

The last rock fall occurred on Friday when attempts were made to use an American Auger drill flown in from Delhi. The drill machine that was being used before that had broken down and work had to be stopped till the new one reached.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.