May 03, 2026 01:22 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jolt to TMC! Supreme Court rejects plea challenging central staff deployment at Bengal counting centres | Bangladesh MP warns of refugee crisis if BJP wins West Bengal polls | Diplomatic row: Bangladesh summons Indian envoy over Himanta Biswa Sarma remarks | Supreme Court grants Pawan Khera anticipatory bail in case over allegations against Himanta Biswa Sarma's wife | ‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls
Visakhapatnam railway station
Image: PIB

Visakhapatnam railway station receives ‘Green Railway Station Certification’ with highest Platinum rating

| @indiablooms | Jan 25, 2023, at 09:57 pm

Visakhapatnam: Visakhapatnam railway station of East Coast Railway has been awarded the ‘Green Railway Station Certification with highest rating of Platinum' by the Indian Green Building Council (IGBC) for adopting green concepts thereby reducing the adverse environmental impact.

DRM/ Waltair, Anup Satpathy received the certification from Dr S Vijayakumar, Chairman, IGBC Visakhapatnam Chapter at a function organised at Visakhapatnam on 24.01.23.

Visakhapatnam is one of the few railway stations to get this prestigious certificate. Visakhapatnam secured 82 out of 100 points in six environmental categories.

The Environment Directorate of Indian Railways, with the support of the IGBC, has developed the Green Railway Station rating system.

It addresses national priorities such as water conservation, handling of waste, energy efficiency, reduced use of fossil fuel, lesser dependence on usage of virgin materials and health and well-being of occupants.

Visakhapatnam railway station performed well in categories such as sustainable facilities, health, hygiene, energy and water efficiency, smart green initiatives, innovation and development.

The following steps were undertaken based on Survey and Recommendations of IGBC that conducted the Survey -

1. Segregation of Waste by Constructing MRF Shed

2. Setting and Operationalization of 500KLD STP for Station & Colony Water

3. Setting up of Solar Panels to conserve Power

4. Well Developed Passenger Amenities

5. 100% fitment of LED Lightings.

This feat has been entirely through team effort of all the departments spearheaded by EnHM WING.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.