April 18, 2025 07:03 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
No change in 'waqf by user' for now till next hearing: Supreme Court to Centre | Supreme Court rules Bengal govt teachers 'not identified as tainted' in SSC scam can continue till fresh appointments | 'Yogi sabse bada bhogi hai': Mamata Banerjee slams Uttar Pradesh CM over Murshidabad riots remark | Uttar Pradesh: 11-year-old speech and hearing impaired girl brutally raped, accused nabbed | US Vice President JD Vance, his family to visit India next week; meet PM Modi | Karnataka Governor sends bill providing 4 pct reservation to Muslims in govt contracts to President | Supreme Court considers issuing interim stay on 3 points of Waqf law, Centre urges for more time to explain | Amid clash with Guv, MK Stalin forms panel to maintain Tamil Nadu's autonomy | 'I have nothing to hide': Robert Vadra reaches ED office on second summons over Haryana land deal case | 'What kind of a language is this?': Opposition slams Modi's 'young Muslims repair punctures' remark over Waqf Act

North Korea still building at its nuclear site: 38 North

| @indiablooms | Jun 27, 2018, at 08:32 pm

Washington, June 27 (IBNS): Despite declaring a denuclearisation of the Peninsula during the recently held summit in Singapore, North Korea is still carrying out rapid improvements to its nuclear research facility, claimed a monitor on Wednesday.

"Commercial satellite imagery from June 21 indicates that improvements to the infrastructure at North Korea’s Yongbyon Nuclear Scientific Research Center are continuing at a rapid pace," said 38 North website.

"Modifications to the 5 MWe plutonium production reactor’s cooling system appear complete, but a less-than-normal cooling water discharge from the outfall pipe makes a determination of the reactor’s operational status difficult," reported 38 North website.

"The status of the Radiochemical Laboratory—used to separate plutonium from spent fuel rods—remains uncertain, although the associated Thermal Plant has likely continued operations, and a small non-industrial building of an unknown purpose has been newly erected near the cooling tower,"the website claimed.

"Construction continues on support facilities throughout other operational areas of Yongbyon, especially at the Experimental Light Water Reactor (ELWR), where the new engineering office building appears externally complete and a small building similar to the one observed at the Radiochemical Laboratory has been erected," it said.

"Continued work at the Yongbyon facility should not be seen as having any relationship to North Korea’s pledge to denuclearize. The North’s nuclear cadre can be expected to proceed with business as usual until specific orders are issued from Pyongyang," the website further said.

Trump  sanctions N Korea for posing 'extraordinary threat':

Following US President Donald Trump's recent meeting with Kim Jong-un, Trump had dismissed any further threat from North Korea.

Yet, on Friday, his office said that the Asian nation still poses extraordinary threats and must be sanctioned.

It followed the cancelled military drills between South Korea and the USA.

Trump extended the rule while citing "the existence and risk of proliferation of weapons-usable fissile material on the Korean Peninsula and the actions and policies of the Government of North Korea".

Kim and Trump met In Singapore this month.

 

Image: twitter.com/Scavino45

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Close menu