August 31, 2026 12:10 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
VHP breaks silence on Durga Puja ‘guidelines’: No blanket non-veg ban, clarifies stand on theme pandals amid backlash | No non-veg near pandals, no ‘distorted’ idols: VHP’s Durga Puja guidelines spark Bengal debate | ‘Either they will stay, or we will’: Suvendu Adhikari's warning to Jadavpur students over 'Azadi' slogans | 'Inaccurate reports': Penguin India denies dropping Sonia Gandhi memoir | ‘Clean my shoes’: Greater Noida woman detained after alleged abuse, assault of security guards | 21-year-old model stabbed to death in Delhi; gym trainer arrested after encounter | Abhishek Banerjee, Derek O'Brien, other TMC leaders booked after Camac Street clash with Kolkata Police | Kanpur plane crash: Training aircraft crashes near Ganges, two pilots killed | Big IT boost for Bengal: LTM opens global delivery & AI centre in Kolkata's New Town | 21-year-old Delhi model found stabbed at Delhi home, gym trainer accused of killing her
Ukraine crisis
Image credit: UNI

Ukraine crisis: Power lines at Chernobyl Nuclear Power Plant being repaired

| @indiablooms | Mar 13, 2022, at 02:39 pm

Kyiv/UNI/Sputnik The International Atomic Energy Agency (IAEA) has said that, according to the Ukrainian regulator, work is continuing to repair the damaged power lines at the Chernobyl Nuclear Power Plant (NPP).

"Regarding the situation at the Chornobyl NPP, the Ukrainian regulator said efforts to repair the damaged power lines were continuing but external electricity supplies remain severed since 9 March," the IAEA said in a Saturday statement.

"Diesel generators are continuing to provide back-up power to systems relevant for safety, including spent fuel storage facilities at the site of the 1986 accident, and additional fuel deliveries arrived on 11 March, it said," the IAEA statement said.

According to the IAEA, the Director-General of Russia's Rosatom Alexey Likhachev told IAEA Director-General Rafael Mariano Grossi in a telephone call on Saturday that power lines could be extended from Belarus to supply the Chernobyl NPP.

Russia informed the IAEA that the management and operation of Chernobyl, as well as the Zaporizhzhya Nuclear Power Plant (NPP), is being carried out by Ukrainian personnel, but a group of Russian experts is also providing assistance.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.