January 01, 2026 06:32 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
New Year horror in Switzerland: Dozens feared dead in Crans-Montana bar explosion | Tobacco stocks crushed as govt slaps fresh excise duty from Feb 1 | Vodafone Idea shares explode 10% after surprise settlement and govt relief boost | No third party involved: India govt sources refute China’s Operation Sindoor ceasefire claim | Amit Shah blasts TMC over border fencing; Mamata fires back on Pahalgam and Delhi blast | 'A profound loss for Bangladesh politics': Sheikh Hasina mourns Khaleda Zia’s death | PM Modi mourns Khaleda Zia’s death, hails her role in India-Bangladesh ties | Bangladesh’s first female Prime Minister Khaleda Zia passes away at 80 | India rejects Pakistan’s Christmas vandalism remarks, cites its ‘abysmal’ minority record | Minority under fire: Hindu houses torched in Bangladesh village

Vietnam to connect more bus routes with China-built urban railway

| @indiablooms | May 27, 2019, at 05:03 pm

Hanoi, May 27 (Xinhua/UNI) Vietnam's capital Hanoi plans to increase the number of bus routes connected with China-constructed Cat Linh-Ha Dong urban railway from 43 to 50, with 65 bus stops along the route, local media reported on Monday.

The bus system which connects with Cat Linh-Ha Dong railway route, built by the China Railway Sixth Group, will be able to serve 313,000-344,000 passengers a day, daily newspaper Vietnam News quoted the Hanoi Transport Department as saying.

If the urban railway begins operation, 15-20 percent of drivers in Hanoi will switch to using the train, according to the department.

Once the line opens, the number of taxis operating along its route is expected to decrease due to people taking buses to use the railway, reducing traffic congestion.

There will be 13 trains, including 12 in operation and one in standby, running through 12 stations in a total distance of 13 kilometers in three districts, Sun Dezhi, deputy general manager of the overseas branch of the China Railway Sixth Group, told Xinhua recently.

Each train, which has four carriages with a total length of 79 meters, can carry up to 1,000 passengers. It will take passengers around 30 minutes to complete the whole journey.

The Cat Linh-Ha Dong elevated railway project officially started construction in October 2011. The trial run of the railway officially began in September 2018.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.