December 14, 2024 08:35 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengaluru techie suicide: Karnataka Police issues summons to wife Nikita, her family members | French President Macron appoints centrist leader Francois Bayrou as new Prime Minister | Congress always prioritised personal interest over Constitution: Rajnath Singh | Jaishankar calls attack on Hindus in Bangladesh 'a source of concern' | Allu Arjun arrested over woman's death in stampede during Pushpa 2 premiere show | RBI receives bomb threat in Russian language, case filed | UP teenager kills mother, lives with body for 5 days | At least six people including a child killed in Tamil Nadu hospital fire | Amid Atul Subhash row, SC says mere harassment is not enough to prove abetment to suicide | India's D Gukesh becomes youngest ever world champion in chess
Sela Tunnel Project
Image: PIB

BRO conducts final blast concluding all excavation on Sela Tunnel Project

| @indiablooms | Jan 22, 2022, at 10:07 pm

New Delhi: The final blast for the 980-metre long Sela Tunnel (Tunnel 1) was conducted by Director General Border Roads (DGBR) Lt Gen Rajeev Chaudhry through an e-ceremony from New Delhi on Jan 22, 2022.

This marks the culmination of the excavation works on the complete Sela Tunnel Project.

This feat has been achieved by Border Roads Organisation (BRO) amidst inclement weather and heavy snowfall.

The Sela Tunnel Project is located in the West Kameng District of Arunachal Pradesh. Once completed, it will be a lifeline as it will provide all weather connectivity to Tawang.

The project comprises of Tunnel 1, which is a 980 m long single tube tunnel and Tunnel 2, which is a 1555 m long twin tube tunnel.

Tunnel 2 has one bi-lane tube for traffic and one escape tube for emergencies. It will also be one of the longest tunnels to have been constructed above altitude of 13,000 feet.

The project also includes construction of an approach road of seven kilometres to Tunnel 1, which takes off from BCT Road and a link road of 1.3 kilometres, which connects Tunnel 1 to Tunnel 2.

The foundation stone of the Sela Tunnel Project was laid by the Prime Minister Narendra Modi in 2019.

On Jan 15, 2021, after the first blast was conducted by the DGBR, excavation work on Tunnel 1 commenced.

Thereafter, on Oct 14 2021, Raksha Mantri Rajnath Singh carried out the breakthrough blast of the 1,555 meter Tunnel 2, through an e-ceremony from India Gate, marking the end of excavation on Tunnel 2.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.